Home Latest News National Pics | Cutter head of Godavari -1 lowered at Vidya Nagari in Mumbai Metro 3 Project

Pics | Cutter head of Godavari -1 lowered at Vidya Nagari in Mumbai Metro 3 Project

0
1,123
Pics | Cutter head of Godavari -1 lowered at Vidya Nagari in Mumbai Metro 3 Project
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3
Listen to this story
0:00

Today cutter head of #Godavari-1 TBM lowered at Vidya Nagari launching shaft. It will soon start tunneling for 2.9 km stretch between Vidya Nagari and CISA Domestic Airport.

Here are some photographs taken from the construction site:

Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3

Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3

Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3

ChatGPT Image Sep 12 2026 11 31 16 AMRead nextSouthern Railway Achieves 100% Electrification: A 95-Year Journey from 1931 to 202612 Sep 2026

Add Metro Rail News as a preferred source on Google

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here