Navi Mumbai Metro is an operational rapid transit system run by CIDCO, with Line 1 covering about 11 km and 11 elevated stations between Belapur and Pendhar. Fares run ₹10 to ₹40, trains operate 06:00 to 22:00 roughly every 15 minutes. Its route map, stations, fares and timings are below.
Navi Mumbai Metro is developed by CIDCO, the planning authority for the satellite city, rather than a dedicated metro corporation. Its first elevated line serves the Belapur–Pendhar corridor across the planned townships of Navi Mumbai, with a depot at Taloja, and forms the initial piece of a larger network envisioned across the region.
Further corridors are planned to extend the metro toward the upcoming Navi Mumbai International Airport and connect additional nodes of the satellite city.
Navi Mumbai is a rare case of a metro built by a city-planning authority as part of an integrated new-town scheme, rather than retrofitted into an existing city. That makes it a distinctive model of transit-led development, the line is meant to shape where the city grows, not just serve where it already has.
Official source: cidco.maharashtra.gov.in
| Phase | Lines | Stations | Length (km) | Status |
|---|---|---|---|---|
| Line 1 | Belapur–Pendhar | 11 | 11.1 | Operational |
Latest ridership: Over 12,000 a day (2025)
Navi Mumbai Metro fares range from ₹10 to ₹40, set by CIDCO.
| Distance / zone | Fare |
|---|---|
| Minimum fare | ₹10 |
| Maximum fare | ₹40 |
Navi Mumbai Metro service timings and frequency:
| Service | Time |
|---|---|
| Operating hours | 06:00 to 22:00 |
| Frequency (peak) | about 15 minutes |
As of 2026, Navi Mumbai Metro is at the operational stage under CIDCO. [Verify latest with the operator.]
Navi Mumbai Metro has a planned/operational route length of about 11.10 km.
Navi Mumbai Metro is implemented by CIDCO.
Navi Mumbai Metro operates 06:00 to 22:00. Trains run at a frequency of about 15 minutes.
Navi Mumbai Metro fares range from ₹10 to ₹40, set by CIDCO. A smart card usually gives a small discount.
No awarded tenders or contracts recorded yet.
No ongoing tenders for this project right now.
No upcoming tenders announced yet.