High-Speed Rail in India: Bullet Train Corridors, Status & Latest News

India’s high-speed rail (HSR) programme, better known as the bullet train project, is building a national network of dedicated corridors for trains running at up to 320 km/h. The National High Speed Rail Corporation Limited (NHSRCL) leads the work. It starts with the Mumbai to Ahmedabad corridor and grows into a planned web of routes linking India’s major economic centres. This page tracks every HSR corridor, with what is under construction, what is approved and what is proposed, plus the news as it lands.

High-speed rail corridors at a glance

Each corridor links to its full Metro Rail News profile with route, alignment, cost and current status.

What counts as high-speed rail

High-speed rail means dedicated, fully grade-separated corridors engineered for sustained speeds of 250 km/h and above. That puts it in a different class from conventional railways, from metro, and even from the 160 km/h Regional Rapid Transit System. India’s corridors are designed for an operating speed of 320 km/h and a maximum design speed of 350 km/h, on standard-gauge ballastless slab track, using Japanese Shinkansen technology transferred through an India and Japan partnership.

Mumbai to Ahmedabad: India’s first bullet train

The Mumbai–Ahmedabad High Speed Rail (MAHSR) corridor is the flagship. It is a 508 km line connecting Mumbai, Thane, Vapi, Surat, Vadodara and Ahmedabad, with an undersea tunnel section near Mumbai and elevated viaducts across Gujarat and Maharashtra. Built on Shinkansen E-series trainset technology, it will cut the Mumbai to Ahmedabad journey from more than six hours to around two. Viaducts, stations and track works are progressing, and the corridor sets the template for everything that follows.

The wider HSR network

Detailed project reports cover a series of corridors radiating from Delhi, Mumbai and other hubs. They include Delhi–Varanasi, Delhi–Ahmedabad, Delhi–Amritsar, Mumbai–Nagpur, Mumbai–Hyderabad, Chennai–Mysore and Varanasi–Howrah. Taken together, they would join India’s largest cities into a single high-speed grid over the coming decades.

Who is building it

NHSRCL runs the programme. It is a special purpose vehicle jointly owned by the Government of India, through the Ministry of Railways, and the participating state governments. Its remit covers land acquisition, civil works, systems, rolling stock and eventual operations, with Japanese technical and financial support.

Latest high-speed rail news

The stories below refresh on their own as we publish: contract awards, viaduct and tunnel milestones, station progress, and rolling-stock and technology decisions across the corridors.

High Speed Rail ProjectsBullet Train Project: Electrification work gains momentum on Mumbai-Ahmedabad High-Speed Rail Corridor23/07/2026High Speed Rail ProjectsMumbai-Ahmedabad Bullet Train: Second TBM begins work on India’s first Undersea Rail Tunnel beneath Thane Creek20/07/2026High Speed Rail ProjectsNHSRCL launches 15th steel bridge for the Mumbai-Ahmedabad Bullet Train Project18/07/2026Chennai-Bengaluru-MysuruChennai-Bengaluru Bullet Train Project gains momentum: NHSRCL begins tendering15/07/2026High Speed Rail ProjectsMumbai-Ahmedabad Bullet Train Project completes all 13 Portal Beam launches11/07/2026High Speed Rail ProjectsAshwini Vaishnaw to launch first Tunnel Boring Machine for Mumbai-Ahmedabad Bullet Train Project04/07/2026High Speed Rail ProjectsHigh-Speed Rail: NHSRCL invites bids to design civil structures for future 350 kmph bullet train corridors27/06/2026High Speed Rail ProjectsBig step towards High-Speed Rail: NHSRCL Invites global manufacturers to build faster version of bullet train in India27/06/2026High Speed Rail ProjectsBEML to unveil the prototype of India’s first Bullet Train by early 202720/06/2026High Speed Rail ProjectsIndia’s First Tunnel Hood Technology Introduced for the High Speed Rail Corridor15/06/2026High Speed Rail ProjectsMumbai – Ahmedabad Bullet Train Project completes 45 meter viaduct over Kalupur flyover30/05/2026High Speed Rail ProjectsMumbai-Ahmedabad bullet train project reaches new milestone as second TBM cutterhead lowered near Mumbai25/05/2026

See all high-speed rail coverage →

Frequently asked questions

What is the status of India’s bullet train?
The Mumbai to Ahmedabad corridor is India’s first bullet train and is under construction, with viaducts, stations and track works progressing. It is the first of several planned HSR corridors.

How fast will Indian high-speed trains run?
The corridors are designed for an operating speed of 320 km/h, with a maximum design speed of 350 km/h.

Who is building India’s high-speed rail?
The National High Speed Rail Corporation Limited (NHSRCL), using Japanese Shinkansen technology on the Mumbai to Ahmedabad line.

How is HSR different from RRTS and Namo Bharat?
HSR is intercity rail at 320 km/h on dedicated corridors. RRTS, branded Namo Bharat, is regional rail at 160 km/h connecting a city with its surrounding region. See our Namo Bharat and RRTS guide.