As of 17 Oct 2026, Kochi Metro is operational (since 19 Jun 2017). Latest news: 6 Nov 2026.
Kochi Metro is an operational metro system in Kochi, run by Kochi Metro Rail Limited (KMRL). It covers 28.48 km, with fares from ₹10 to ₹60 and trains operating 06:00 to 22:00 roughly every 8 to 10 minutes. Its route map, stations, fares and timings are below.
Kochi Metro is the rapid transit system serving Kerala’s commercial capital, run by Kochi Metro Rail Limited (KMRL). It opened in 2017 and stands out for how tightly it ties into the rest of the city’s transport, including the Kochi Water Metro, so a single journey can move between train, boat and bus on one ticket.
The metro runs about 28 km along an elevated corridor through the heart of Kochi, linking Aluva in the north with the southern parts of the city and its major transit points. Extensions push the line further toward Kakkanad and the IT corridor. KMRL also runs the Kochi Water Metro, and the two systems share ticketing so riders can switch between rail and boats without friction.
KMRL builds and runs both the metro and the water metro, and the agency is known for its social hiring, including a large workforce drawn from the Kudumbashree network. Current work covers line extensions and deeper integration with feeder services. New sections, contract awards and tenders arrive as construction continues.
Stations listed in order along each line, with interchanges where a station connects to another line, a railway station or a bus terminal. Aluva to Palarivattom inaugurated 17 Jun 2017 (public 19 Jun 2017); Palarivattom to Maharaja's College 3 Oct 2017; Maharaja's College to Thykoodam 3 Sep 2019; Thykoodam to Pettah 7 Sep 2020; Pettah to SN Junction 1 Sep 2022; SN Junction to Tripunithura 6 Mar 2024. Phase 2 Pink Line (JLN Stadium to Infopark via Kakkanad, 11.2 km, 11 stations, elevated) under construction since Jul 2024; full rail consignment received Sep 2026 but track laying not started; commissioning now targeted Aug 2027 (earlier Dec 2025, then Jun/Dec 2026 targets missed). Phase 3 (Aluva to Angamaly via airport) DPR submitted Aug 2026.
| # | Station | Connects to |
|---|---|---|
| 1 | Aluva | Aluva railway station |
| 2 | Pulinchodu | |
| 3 | Companypady | |
| 4 | Ambattukavu | |
| 5 | Muttom | |
| 6 | Kalamassery | |
| 7 | Cochin University | |
| 8 | Pathadipalam | |
| 9 | Edapally | |
| 10 | Changampuzha Park | |
| 11 | Palarivattom | |
| 12 | JLN Stadium | future Phase 2 Pink Line to Infopark (under construction) |
| 13 | Kaloor | |
| 14 | Town Hall | Ernakulam Town (North) railway station (nearby) |
| 15 | MG Road | |
| 16 | Maharaja's College | |
| 17 | Ernakulam South | Ernakulam Junction (South) railway station |
| 18 | Kadavanthra | |
| 19 | Elamkulam | |
| 20 | Vyttila | Vyttila Mobility Hub (bus terminal); Kochi Water Metro Vyttila terminal |
| 21 | Thykoodam | |
| 22 | Pettah | |
| 23 | Vadakkekotta | |
| 24 | SN Junction | |
| 25 | Tripunithura | Tripunithura railway station |
What are the Kochi Metro timings?
Kochi Metro operates 06:00 to 22:00 (Sun from 07:30). Trains run at a frequency of 8 to 10 minutes.
Who runs the Kochi Metro?
Kochi Metro Rail Limited (KMRL), which also runs the Kochi Water Metro.
When did the Kochi Metro open?
It opened in 2017.
Is the Kochi Metro linked to the Water Metro?
Yes. KMRL runs both, and they share integrated ticketing so riders can move between rail and boats.
How busy is Kochi Metro?
About 1 lakh passengers a day (2025-26).
What are Kochi Metro fares?
Distance-based across six zones, from Rs 10 to Rs 60.
Is there a Kochi Metro route map and journey planner?
Yes. This hub has an interactive route map and journey planner, plus stations, fares, live tenders and the latest updates.
| Phase | Lines | Stations | Length (km) | Status |
|---|---|---|---|---|
| Line 1 (Blue) | Aluva–Tripunithura | 25 | 28.1 | Operational |
| Line 2 (Pink) | JLN Stadium–Infopark | 11 | 11.2 | Under Construction |
Latest ridership: About 1 lakh a day (2025-26)
Kochi Metro fares range from ₹10 to ₹60, set by Kochi Metro Rail Limited (KMRL).
| Distance / zone | Fare |
|---|---|
| Minimum fare | ₹10 |
| Maximum fare | ₹60 |
Kochi Metro service timings and frequency:
| Service | Time |
|---|---|
| Operating hours | 06:00 to 22:00 (Sun from 07:30) |
| Frequency (peak) | 8 to 10 minutes |
| Tender / Contract | Agency | Value | Awarded to |
|---|---|---|---|
| Entry/exit buildings: Civil Station Junction & Cochin SEZ (Phase II) | — | ₹21.5 Cr | Crescent Construction Company |
| E&M work contract: Phase 2 | — | ₹— | Godrej and Boyce Manufacturing |
| Ballastless track, elevated section: Phase 2 | — | ₹130.22 Cr | Texmaco Rail & Engineering |
No ongoing tenders for this project right now.
No upcoming tenders announced yet.
Bid values, closing dates and awardees are for subscribers. See plans.