SponsoredInnoBus Conference & Expo 2026, 23 December 2026, Bharat Mandapam, New Delhi

Bhopal Metro

Operational Operator: MPMRCL Length: 6.22 km Since: 21/12/2025 Updated: Official site ↗

As of 17 Oct 2026, Bhopal Metro is operational (since 21 Dec 2025). Latest news: 26 Oct 2026.

Bhopal Metro is an operational metro system in Bhopal, run by Madhya Pradesh Metro Rail Corporation (MPMRCL). It covers 6.22 km across 8 stations, with fares from ₹20 to ₹40 and trains operating 06:00 to 22:00 roughly every 10 to 15 minutes. Its route map, stations, fares and timings are below.

Bhopal Metro, built by Madhya Pradesh Metro Rail Corporation (MPMRCL), is bringing rapid transit to the state capital in parallel with the corporation’s larger Indore project. Its Phase 1 plan centres on two corridors combining elevated and underground sections through the city, with a priority stretch of around 6 km beginning operations.

Construction continues on the balance of the network, which will connect Bhopal’s main residential, administrative and transport nodes including the Rani Kamalapati and Bhopal Junction railway stations.

Why it matters

As the smaller of MPMRCL’s two builds, Bhopal is a measure of whether a state capital of its size can sustain a full metro’s economics, a question increasingly relevant as more Tier-2 cities weigh metros against lighter transit modes. Its shared corporation with Indore also allows procurement and engineering efficiencies worth tracking.

Key facts

  • Operator: Madhya Pradesh Metro Rail Corporation (MPMRCL)
  • Phase 1: two corridors, elevated + underground
  • Priority section: 6.22 km, 8 stations

Bhopal Metro stations

Stations listed in order along each line, with interchanges where a station connects to another line, a railway station or a bus terminal. Priority corridor AIIMS to Subhash Nagar (6.22 km, 8 elevated stations) flagged off on 20 December 2025 by Union Minister Manohar Lal and CM Dr Mohan Yadav; commercial service from 21 December 2025. No extension opened as of 17 Oct 2026. Remaining Orange Line (Subhash Nagar to Karond, 8.77 km, 8 stations incl. 2 underground at Bhopal Railway Station and Nadra Bus Stand) and the whole Blue Line are under construction. Phase 1 total about 27.9 km, 30 stations (Pul Bogda shared).

Orange Line (Line 2), priority corridor (AIIMS to Subhash Nagar, 8 stations)

#StationConnects to
1AIIMS
2Alkapuri
3DRM Office
4Rani KamlapatiRani Kamlapati railway station
5MP Nagar
6Board Office Chauraha
7Kendriya Vidyalaya
8Subhash Nagar

Orange Line (Line 2), full route (Karond Chauraha to AIIMS, 16 stations, under construction)

#StationConnects to
1Karond Chauraha
2Krishi Upaj Mandi
3DIG Bungalow
4Sindhi Colony
5Nadra Bus StandNadra bus stand (buses)
6Bhopal Railway StationBhopal Junction railway station
7Aishbagh
8Pul BogdaBlue Line (Line 5), under construction
9Subhash Nagar
10Kendriya Vidyalaya
11Board Office Chauraha
12MP Nagar
13Rani KamlapatiRani Kamlapati railway station
14DRM Office
15Alkapuri
16AIIMS

Blue Line (Line 5) (Bhadbhada Chauraha to Ratnagiri Tiraha, 14 stations, under construction)

#StationConnects to
1Bhadbhada Chauraha
2Depot Chauraha
3Jawahar Chowk
4Roshanpura Chauraha
5Kushabhau Thakre Hall
6Parade Ground
7Pul BogdaOrange Line (Line 2)
8Prabhat Chauraha
9Govindpura
10Govindpura Industrial Area
11JK Road
12Indrapuri
13Piplani
14Ratnagiri Tiraha

Explore more

Official source: www.mpmetrorail.com

Latest updates

3 tenders tracked →

See all news & updates →

Phases

PhaseLinesStationsLength (km)Status
Orange LineAIIMS–Karond Circle1614.99Partially operational
Blue LineBhadbhada Square–Ratnagiri1412.91Under Construction

Latest ridership: A few hundred a day on the priority section (early 2026)

Fares

Bhopal Metro fares range from ₹20 to ₹40, set by MPMRCL.

Distance / zoneFare
1 to 2 stations₹20
3 to 5 stations₹30
Full corridor₹40

Timings

Bhopal Metro service timings and frequency:

ServiceTime
Operating hours06:00 to 22:00
Frequency (peak)10 to 15 minutes

Frequently asked questions

What is the status of Bhopal Metro?

As of 2026, Bhopal Metro is at the operational stage under MPMRCL.

Who operates Bhopal Metro?

Bhopal Metro is implemented by MPMRCL.

What are the Bhopal Metro timings?

Bhopal Metro operates 06:00 to 22:00. Trains run at a frequency of 10 to 15 minutes.

How much is the Bhopal Metro fare?

Bhopal Metro fares range from ₹20 to ₹40, set by MPMRCL. A smart card usually gives a small discount.

Journey Planner & Route Map

Awarded tenders & contracts

Tender / ContractAgencyValueAwarded to
AFC system (shared Bhopal + Indore contract)—₹150 CrAurionpro Solutions

Ongoing tenders

No ongoing tenders for this project right now.

Upcoming tenders

No upcoming tenders announced yet.

Bid values, closing dates and awardees are for subscribers. See plans.