Mumbai Metro Line 3 (Aqua Line)

Operational Operator: MMRCL (operated and maintained by DMRC) Length: 33.5 km Since: 07/10/2024 Updated: Official site ↗

Mumbai Metro Line 3, the Aqua Line, is Mumbai’s first fully underground metro: 33.5 km from Aarey JVLR in the north to Cuffe Parade in the south, with 27 stations. It has run end to end since October 2025, with fares from ₹10 to ₹70 and trains from 05:55 to 22:30. Its stations, fares, timings and the latest news are below.

Built by Mumbai Metro Rail Corporation (MMRCL), the Aqua Line is often called the Colaba–Bandra–SEEPZ line. It links the island city’s business districts at Cuffe Parade, Churchgate and CSMT with Worli, Dadar, the Bandra Kurla Complex, both terminals of Mumbai airport and the SEEPZ and MIDC employment hubs in Andheri, a north–south route that previously meant a crowded suburban train or a long road journey.

Why it matters

The Aqua Line runs under the densest part of Mumbai, where there was no room to build an elevated line, and it is the first metro to reach the old business district in the south of the city. It gives airport passengers a rail link to BKC and South Mumbai, and it takes pressure off the Western Railway suburban line, which runs parallel to it for much of the route.

Key facts

  • Owner: Mumbai Metro Rail Corporation Ltd (MMRCL), a joint venture of the Government of India and the Government of Maharashtra
  • Operations and maintenance: Delhi Metro Rail Corporation (DMRC), under contract to MMRCL
  • Length: 33.5 km, almost entirely underground
  • Stations: 27, of which 26 are underground
  • Trains: Alstom Metropolis, built for driverless operation
  • Fares: ₹10 to ₹70
  • Cost: about ₹37,276 crore
  • Opened: Aarey JVLR to BKC in October 2024, BKC to Acharya Atre Chowk in May 2025, and the full line to Cuffe Parade in October 2025

Mumbai Metro Line 3 stations

The 27 stations below run north to south. Interchanges are listed where the station connects directly with another line or a main railway terminus.

#StationConnects to
1Aarey JVLR
2SEEPZ
3MIDC Andheri
4Marol NakaLine 1 (Blue)
5CSMIA Terminal 2Mumbai airport, Terminal 2
6Sahar Road
7CSMIA Terminal 1Mumbai airport, Terminal 1
8Santacruz
9Bandra Colony
10Bandra Kurla Complex
11Dharavi
12Shitaladevi Mandir
13Dadar
14Siddhivinayak
15Worli
16Acharya Atre Chowk
17Science Centre
18Mahalaxmi
19Jagannath Shankar Sheth
20Grant Road
21Girgaon
22Kalbadevi
23CSMTCSMT railway terminus
24Hutatma Chowk
25ChurchgateChurchgate railway station
26Vidhan Bhavan
27Cuffe Parade

Explore more

Official source: mmrcl.com

Latest updates

56 tenders tracked →

See all news & updates →

Phases

PhaseLinesStationsLength (km)Status
Phase 1Aarey JVLR to BKC1012.7Operational
Phase 2ABKC to Acharya Atre Chowk69.8Operational
Phase 2BAcharya Atre Chowk to Cuffe Parade1111.0Operational

Latest ridership: About 1.5 lakh a day (October 2025, after the full line opened)

Milestones

  • Aarey JVLR to BKC opens to passengers
  • BKC to Acharya Atre Chowk opens
  • Full line to Cuffe Parade opens

Fares

Mumbai Metro Line 3 (Aqua Line) fares range from ₹10 to ₹70, set by MMRCL (operated and maintained by DMRC).

Distance / zoneFare
Minimum fare₹10
Maximum fare (end to end)₹70

Timings

Mumbai Metro Line 3 (Aqua Line) service timings and frequency:

ServiceTime
First train (both ends)05:55
Last train (both ends)22:30

Frequently asked questions

What is the Mumbai Metro Line 3 route?

Line 3, the Aqua Line, runs 33.5 km from Aarey JVLR in the north to Cuffe Parade in the south, via the airport, BKC, Dadar, Worli, CSMT and Churchgate.

How many stations does the Aqua Line have?

27 stations, of which 26 are underground.

What is the Mumbai Metro Line 3 fare?

Fares are distance-based, from ₹10 to ₹70 for the full journey.

What are the Aqua Line timings?

The first trains leave both ends at 05:55 and the last at 22:30.

Does Mumbai Metro Line 3 go to the airport?

Yes. It has stations at both Terminal 1 and Terminal 2 of Chhatrapati Shivaji Maharaj International Airport.

Who runs the Aqua Line?

It is owned by Mumbai Metro Rail Corporation (MMRCL), with operations and maintenance by Delhi Metro Rail Corporation (DMRC).

When did Line 3 fully open?

The full line to Cuffe Parade opened in October 2025, after the Aarey to BKC section in October 2024 and BKC to Acharya Atre Chowk in May 2025.

Journey Planner & Route Map

Awarded tenders & contracts

No awarded tenders or contracts recorded yet.

Ongoing tenders

TenderAgencyValueBid dueStatus
MahaMetro invites maintenance tender for Navi Mumbai Metro Line-1 Maha MetroOpen
MRVC invites bids for electrification work in Borivali-Virar Section of Western RailwaysMRVCSubscribersUnder evaluation
Maha Metro floats Rs 3.54 cr tender for Navi Mumbai Metro Line 1 maintenanceMaha MetroSubscribersSubscribersUnder evaluation

Upcoming tenders

No upcoming tenders announced yet.

Bid values, closing dates and awardees are for subscribers. See plans.