Home Metro Rail Projects Bengaluru Metro Pink Line: CMRS Completes 3-Day Inspection of Kalena Agrahara-Tavarekere Section 

Bengaluru Metro Pink Line: CMRS Completes 3-Day Inspection of Kalena Agrahara-Tavarekere Section 

2 min read
2
6,533
Bengaluru Metro Pink Line: CMRS Completes 3-Day Inspection of Kalena Agrahara-Tavarekere Section 
Bengaluru Metro's Pink Line cannot open to passengers until 36 safety and technical observations from the CMRS inspection are resolved.
Listen to this story
0:00

BENGALURU (Metro Rail News):  Bengaluru Metro’s 7.5-km elevated Pink Line section has cleared a three-day statutory safety inspection, bringing the Kalena Agrahara-Tavarekere stretch closer to passenger operations. However, BMRCL must meet the conditions set by the safety commissioner before it can receive authorization to open the line.

The Commissioner of Metro Railway Safety (CMRS), Southern Circle, V. Venkatasubramanian, completed the inspection on October 8. The exercise covered the elevated alignment, stations, depot facilities, train trials and the Operations Control Centre (OCC).

Bengaluru Metro inspection covers 6 stations and depot 

The statutory inspection took place from October 6 to 8, covering the full 7.5-km elevated section along Bannerghatta Road. The inspection schedule included:

  • 6 October: Motor trolley inspection of the mainline and associated infrastructure.
  • 7 October: Further inspection of the line, checks at Kothanur Depot, and train trials and testing.
  • 8 October: Inspection of the Operations Control Centre at Baiyappanahalli.

The section has six stations: Kalena Agrahara, Hulimavu, IIM Bangalore, JP Nagar 4th Phase, Jayadeva Hospital and Tavarekere. Jayadeva Hospital will serve as an interchange with the existing Metro network.

Get the Daily Metro & Rail Brief

Join 125,000+ metro and rail professionals. Project updates, new tenders and contract awards from across India, in your inbox every day.

Free · One email a day · Unsubscribe anytime · We never share your address

Bengaluru Metro secured several approvals before safety inspection

Bengaluru Metro Rail Corporation Limited (BMRCL) had completed several technical and regulatory steps before the CMRS inspection. The Research Designs and Standards Organisation (RDSO) issued the speed certificate in August 2026. The Railway Board subsequently granted provisional sanction for the rolling stock, while the signalling system received certification from the Independent Safety Assessor (ISA).

The CMRS inspection was the next statutory step before the section can open for public service. The inspection’s completion does not automatically mean the line is cleared for passengers. The safety commissioner will issue authorisation subject to BMRCL complying with the observations and conditions recorded during the inspection.

Bengaluru Metro network to cross 100 km

The elevated Pink Line section will extend Bengaluru Metro’s operational network from 96.10 km to 103.60 km once it opens. The corridor will improve Metro access along Bannerghatta Road and adjoining neighbourhoods. It will also provide an interchange at Jayadeva Hospital, strengthening connections with the existing network.

Also Read: Bengaluru Metro Pink Line: CMRS Begins 3-Day Safety Inspection of 7.5-km Elevated Stretch

kalena agrahara metro station pink line bengaluruRead nextAlstom CBTC Signalling Runs Bengaluru Metro Pink Line’s 7.5 km Section With Automatic Train Operation From Day One16 Nov 2026

Add to Preferred Sources

2 COMMENTS

  1. I saw the video why it was delayed in you tube and i follow the metro rail project in banglore very keenly as it is the nervous system of banglore because due to the notorious traffic of banglore it is a gods gift to the people as our banglore is a lifeline and feeding many families who come from different places to earn their livelihood here our ministry byre gowda is trying is best but too many heardels for him also one suggestion for the metro is please increase the frequency of trains in the peak hours like morning 8 to 10 am and evening 5 to 7 pm as the rush in this hours makes uncomfortable to the passengers especially in the evenings people will be returning home with their stinking smells it soffacates the students and senior citizens and people with their small children please make a note of this increase the frequency of trains in peak hours

  2. Sure I saw a woman complanig about her lost thing near sandel wood factory platform please see that face recognition technology is used in metro station and more cctv camera are used in train and platforms i noticed cameras but in train some more is needed i felt like that

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here