Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
33.1 C
Delhi
Wednesday, October 9, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Anand Vihar RAPIDX Station to Receive Dedicated Pedestrian Bridge Constructed by NCRTC

Date:

Share post:

DELHI (Metro Rail News): A dedicated pedestrian bridge is being constructed at Anand Vihar RAPIDX station of the Delhi-Ghaziabad-Meerut RRTS corridor. Apart from this, two separate bridges are also being built for segregated entry and exit of vehicles into the station premises as a part of multimodal integration with all existing modes of transport at this point. These 3 bridges will be built by NCRTC over the Ghazipur drain, passing between Anand Vihar RAPIDX station and Chaudhary Charan Singh Marg.

In these three bridges, the right bridge will be used for vehicular entry inside the Anand Vihar RAPIDX station, while the left bridge will be used as the vehicular exit. The middle one will be used only for the to-and-fro movement of pedestrians inside the station premises.

The bridge being constructed over the Ghazipur drain for the entry of vehicles into the Anand Vihar RAPIDX station is about 10 meters wide. Taxis, private vehicles etc., will be able to enter the premises from this entrance bridge and drop passengers at the station gate. Also, the exit bridge being constructed over the drain at the left end of the station is 13 meters wide and will enable these vehicles to drive back to the main road.

A dedicated pedestrian bridge is being constructed between these two, which will be about 5 meters wide. Lakhs of commuters travel daily from Anand Vihar via various modes of transport. It has often been observed that passengers have to go through a lot of trouble to change different modes of transport. They have to travel a long distance to reach another mode, battling congested, chaotic traffic. This leads to overcrowding near these public means, which hinders the movement of vehicles and leads to traffic jams on the road.

Keeping these problems in mind, NCRTC decided to construct separate entry and exit routes to ensure the smooth, convenient and safe travel of commuters. The location of the station has also been strategically planned in such a way that it is built as close as possible to existing public transport means.

This station is being integrated with 6 modes of public transport, which include Swami Vivekananda (Anand Vihar) inter-state bus stand, city bus stand, Uttar Pradesh State Road Transport Corporation’s bus stand at Kaushambi, two metro lines (Pink and Blue Line) and Anand Vihar Railway Station. Apart from this, a bus stop is also proposed to be built on the main road along these bridge routes. The commuters can get down here and enter the station through these bridges.

Along with this, stairs, lifts and escalators will also be provided to enhance the travel experience of the passengers by making their journey comfortable and convenient to reach the station. This commuter-centric station design and seamless integration between various modes of public transport and Anand Vihar RAPIDX station will provide a seamless, safe, comfortable and hassle-free travel experience to commuters and cut down on their travel time. This step of NCRTC will especially prove to be a boon for senior citizens, children, ladies and commuters travelling with luggage.

NCRTC aims to make the entire 82 km long Delhi-Ghaziabad-Meerut corridor operational by the year 2025. Before that, it will soon commission the 17 km long priority section of this corridor in 2023.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Bangalore Metro Yellow Line To Start Operations In January 2025 

Bangalore (Metro Rail News): Bangalore Metro Rail Corporation Limited( BMRCL) announced on 5 October that the commencement of...

2 Firms Qualify For DDC-03 Contract Of Pune Metro’s Aqua Line Extension 

Pune (Metro Rail News): Two Firms, SYSTRA MVA Consulting (India) and STUP – RITES JV have qualified for...

Titagarh Reveals Train Design For Ahmedabad Metro Phase 2

Ahmedabad (Metro Rail News): Following the inauguration, Ahmedabad Metro Phase 2 reached another milestone as the Titagarh Rail...

CLC Bridge Installed for Mumbai- Ahmedabad Bullet Train Project 

Surat ( Metro Rail News): This week, MG Contractors Pvt. Ltd. (MGCPL) achieved a milestone in the Mumbai...