Home Latest News Trial Run Conducted On Mumbai Metro Line 3 (Aarey- BKC)

Trial Run Conducted On Mumbai Metro Line 3 (Aarey- BKC)

Trial Run Conducted On Mumbai Metro Line 3 (Aarey- BKC)
Representational image only

Mumbai (Metro Rail News): The Mumbai Metro Rail Corporation (MMRC) has successfully carried out trial run on Line 3, Aqua line between the Bandra Kurla Complex (BKC) and Arrey station spanning 12 km covering 10 stations. MMRC also revealed the coach of Line 3. 

mumbai metro
Image Credit: Amar

Mumbai Metro’s Line 3 

aqua line
Image Credit: Amar

Mumbai metro line 3 also referred to as Aqua line, a 33.5 km stretch providing connectivity between Aarey colony and the Cuffe Parade via 27 stations. 

Initially , the operations are expected to begin from Aarey colony and the BKC Stations through 10 stations. 

Stations covered : 

  • Aarey Colony
  • SEEPZ 
  • MIDC
  • Marol Naka
  • CSIA Terminal 2 
  • Sahar Road
  • CSIA Terminal 1 
  • Santa Cruz Vidyanagri
  • Bandra Kurla Complex 

PM Modi is likely to inaugurate the Mumbai Metro Line 3 on 26 September and operations are expected to begin from the first week of October. 

Project Overview

Mumbai Metro – Information, Route Map, Fares, Tenders & Updates

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here