Home Blog Page 771

Bangalore metro | BMRC looking for various engineering position for Bangalore Metro Rail Project

The Bangalore Metro Rail Corporation (BMRC) a special purpose vehicle of (SPV) under joint ownership of Govt.
buy filitra online https://www.ecladent.co.uk/wp-content/themes/twentyseventeen/inc/en/filitra.html no prescription

of India and Govt. of Karnataka, looking for following engineering position for Bangalore Metro Rail Project.

1.Deputy Chief Engineer- 5 posts

2.Executive Engineers- 31 posts

Last date to submit application for the above post is 17-02-2018

For more detail about educational qualifications, experience, age limit etc, please visit official recruitment notification of Bangalore Metro Rail Corporation Ltd.

Mumbai Metro | MMRC designs a comprehensive plan to dig in Metro-3 corridor

Mumbai: The Mumbai Metro Rail Corporation (MMRC) has designed a comprehensive plan to dig below, while allying fears that vibrations caused by work can affect heritage and ruinous structures.

The Metro-3 corridor will pass through Colaba to SEEPZ (the Export Processing Zone of Santacruz Electronics, a special economic zone), making stops at 27 stations, of which 26 will be underground.

Some activists and representatives of citizens have expressed concern for the safety and sustainability of old and heritage buildings since construction began.

Statements received from the concerned officials-

1.About 1,500 families affected by the project have been displaced and a workforce of 7,600, including qualified and unskilled, is at work. (The state agency that implements the project).

2. Best tested and internationally tested technologies are being used and, therefore, that question does not arise.More than 20 types of monitoring tools, tested and tested internationally, have been pressed to ensure the longevity and safety of buildings on the way.The vibrations caused during the piloting work are measured and recorded regularly with advanced instruments.
buy lipitor online medstaff.englewoodhealth.org/wp-content/languages/new/lipitor.html no prescription

The records show that the vibration levels are even less than a quarter of the permitted safety limits allowed for heritage or weak buildings.Underlining the security measures adopted by the MMRC. We have identified the areas that fall into the 50-meter stretch on both sides of the route alignment and classify them into various levels of strengths. The company has hired the best available design consultants who are expanding their professional experience to contractors. This Metro will decrease the growing burden on the local rail, which unfortunately leads to thousands of deaths each year due to overpopulation, and this will eventually change the rules of the game in terms of the transportation scenario in the country. (Ashwini Bhide, Managing Director, MMRC).

Attractive activists and other interested parties to cooperate in the execution of the project, said that Metro services help reduce carbon footprint and pollution, and constitute the most ecological mass public transport system.

GST reduction on metro construction materials can give some relief to Metro construction companies

With the rate of the Tax on Goods and Services (GST) on the construction of the metro and the monorail going down to 12 percent from 18 percent, EPC (engineering-procurement-construction) contractors in space would benefit provided their contracts they will be tendered taking into account the fiscal component. Essentially, if the EPC contractor had submitted an offer for the metro or monorail construction contract on the base price without taxes, then the decrease in the GST slab would prove to be an advantage for the company since the overall cost would decrease.

However, if the contract was tendered, including the tax component, the final cost would remain unchanged. According to experts, some of the contractors who were under stress due to higher costs would get some relief.

“This is a positive step in many aspects for the industry, first, the Capex for projects will be reduced, and second, there will be a significant reduction in working capital, since less funds will be blocked in the advance payment of taxes and Finally, book reconciliation will improve among interested parties, such as the project agency, contractors and subcontractors or suppliers.” (The statement said by SN Subrahmanyan) executive director and general manager of Larsen & Toubro. Larsen and Toubro are building Rs 160 billion metro rail project.

The first phase of the 72 km project was inaugurated in November. The GST Council, led by Union Finance Minister Arun Jaitley, has recommended cutting GST rates for 83 goods and services that cover many sectors and commodities.

The council reduced the GST rate in the construction of metro and monorail projects (construction, assembly, commissioning or installation of original works) from 18 to 12 percent. Companies such as Reliance Infrastructure, Larsen and Toubro, NCC Infra, Simplex Infrastructures, JMC The projects, TPL-CHEC (a joint venture between Tata Projects and China Harbor Engineering Company) and J Kumar based infra-projects in Mumbai are actors in the sector .

ICRA, in a recent report, said that the metro rail sector has seen strong traction in recent years and is expected to provide considerable opportunities for construction companies over the next three to five years due to a strong portfolio of projects that they are in the approval and planning stage.

Currently, the central government encourages cities with more than 2 million people to develop mass transit systems Bombardier is carrying out several metro projects such as the Delhi Metro, Bengaluru Metro Phase II, Mumbai Metro Phase III , Vizag Metro and light rail for the cities of Kerala. Cities such as Kolkata, Chennai, Delhi, Bangalore, Gurgaon, Mumbai and Jaipur already have subway systems. But with almost 50 cities and towns online for modern metro systems, the Tier II cities are ready to witness the next big wave.

UP Govt. approves DPR for Agra, Kanpur and Meerut Metro project

Lucknow: The state cabinet approved detailed project reports (DPR) of the Metro rail route in Agra, Kanpur and Meerut on Wednesday. The Govt. also appointed Lucknow Metro Rail Corporation (LMRC) as the interim consultant to execute the preliminary construction work of the priority section, deposit, retaining walls, etc. of these projects and issue related tenders in anticipation of approval of the Center.

The Kanpur and Agra Metro projects will have two corridors each, while Meerut will have one corridor. All of these corridors expected to be completed by 2024.
buy prelone UK www.calmandgentledentalcare.co.uk/wp-content/languages/new/prelone.html no prescription

The estimated cost of completion of the Agra Metro, Kanpur and Meerut projects, as approved by the state government, is Rs 13,936 crore, Rs 18,342 crore and Rs 14,890 crore respectively.

With the approval of the government, the construction will begin in Sikandara to the Taj East Gate corridor in Agra; IIT Kanpur to Moti Jheel in Kanpur, and between Shraddhapuri Phase-2 and Jagriti Vihar Extension in Meerut.

The DPR of Kanpur was sent for approval last year, but was returned to comply with the New Metro Rail Policy 2017, while the DPR of Agra and Meerut were sent for approval for the first time.

All reports have been made in accordance with the guidelines of the new Metro Rail Policy, which emphasizes the construction of Metro with a 50:50 capital partnership between the Center and the state government. The cabinet also made a nod to the comprehensive mobility plan and alternative analysis report of each of these cities.

Mumbai Mono Rail | Experts express concern over approval to Monorail fare hike

Mumbai:  The Mumbai Metropolitan Region Development Authority (MMRDA) approved rates of Mumbai Mono Rail on Friday. Now it is expected that the phase II of the Mono Rail project will start operating soon.

As Phase I of Chembur to Wadala was hit by poor ridership of just 17,000 per day, MMRDA expects it to improve after Phase II, from Wadala to Sant Gadge Maharaj Chowk, begins operations. However, transport experts have expressed concern that higher fares may further deter travelers from using the monorail.

  1. The increase is in line with the Metro rates that the MMRDA will be operating, it is not according to the Metro One rates and the slabs are much larger. We are not incurring the security charges, “said UPS Madan, Metropolitan Commissioner of MMRDA.

2. “With the increase in rates, the monorail will be converted exclusively for those who can afford it. The monorail connects areas that are currently inhabited by middle class or lower middle class people and may not be able to afford it, leaving them with the only alternative alternative The best buses show that the government’s priority is not the masses, but only those that are reasonably well, Metros and monorails are given more importance for Mumbai to appear as a world-class city, while most travelers do not they can afford them, ” said Sudhir Badami, a transport expert.

3. The shortage of rakes has affected monorail services. While 10 rakes are available, phase I was operating with only four rakes since the others did not work. Phase II is also configured to start operating with only six rakes. “This means that they can only transport between 6,000 and 7,000 passengers per hour, compared to the 20,000 advertised per hour, if they have to transport more passengers, they will have to increase the number of rakes,” said Badami.

Another expert, who did not want to be identified, said the rate increase might not be a bad idea, but it could have been delayed. “While we all expect the number of passengers to improve once Phase II begins, it’s not going to be a phenomenal increase.” Therefore, services could have started with low rates and, once it became popular, rates could increase. Anyway, they are ma-king losses that could stand for a while longer, “he said.

4. Two monorail coaches were destroyed in a fire on November 9 and since then the services of phase I have also been stopped. They are likely to resume only with phase II operations. “The fire has also damaged its credibility and many travelers will now think twice about taking the train, it’s not like the suburban rail service where people have no other alternative, it’s just an expensive toy train for which people have alternatives However, if they manage to provide a good service, it is likely that people forget the incident and opt for the monorail, “he said. However, MMRDA believes that higher fares will not affect the number of passengers. “The low fares were to encourage travelers to switch to public transport, but people now understand the value of public transport and will continue to use it,” said Madan.
buy viagra black online no prescription

Maha Metro looking for various engineering positions for Pune Metro Rail Project

Maharashtra Metro Rail Corporation Limited (Maha Metro), a special purpose vehicle (SPV) under joint ownership of Government of Maharashtra and Government of India, looking for following engineering positions for Pune Metro Rail Project:

  1. Chief Project Manager (Civil-Metro Station and Viaduct) – 1 post
  2. Chief Project Manager (Civil-Underground) – 1 post
  3. General Manager (Design) – 1 post
  4. General Manager (Civil Planning) – 1 post
  5. Chief Project Manager (Track) – 1 post
  6. General Manager (Tender) – 1 post
  7. Additional Chief Project Manager (Civil Underground) – 1 post
  8. Additional General Manager (Design) – 2 posts
  9. Additional General Manager (Civil Planning ) – 2 posts
  10. Additional Chief Project Manager (Quality) – 1 post
  11. Additional Chief Project Manager (Safety) – 1 post
  12. Additional Chief Project Manager (Track) – 1 post
  13. Senior Deputy Chief Project Manager (Civil Underground) – 2 posts
  14. Senior Deputy Chief Project Manager (Track) – 2 posts
  15. Deputy General Manager (Design) – 2 posts
  16. Deputy General Manager (Civil Planning) – 2 posts
  17. Dy. General Manager (Tender) – 2 posts
  18. Manager ( Civil Underground ) – 2 posts
  19. Manager (Track) – 2 posts
  20. Manager (Tender) – 1 post

Last date to submit application for the above post is  01-02-2018.

For more details about educational qualifications, experience, age limit etc, please visit official recruitment notification of Maharashtra Metro Rail Corporation Ltd.

Nagpur Metro | CMRS team visits Maha Metro’s Nagpur Project, inspects facilities

Nagpur: Finally the Commissioner Metro Rail Safety (CMRS) team has completed their first visit to Nagpur Metro Rail Project. A team of three members of the CMRS visited the Maha Metro Nagpur project between Airport South Station and Khapri Station, including MIHAN Train maintenance Depot and inspected several facilities provided at all levels of the project. The inspection, which continued almost all day, was followed by a presentation and meeting with senior officials.

CMRS team inspecting the depot facilities in Mihan depot.
CMRS team inspecting the depot facilities in Mihan depot.

The three-member team was led by Arvind Kumar Jain, Commissioner of Railway Safety (CRS), Central Circle, Mumbai and former IRSE officer of Indian Railways. The other team members included G P Garg and Uttam Prakash, both with the position of Vice President of CRS. The team, which arrived here today in the morning, inspected for the first time the Airport South station to supervise several facilities that are offered there.

The team also inspected the passenger facilities and other operating rooms at the station. Maha Metro MD Dr. Brijesh Dixit, led by senior officials, accompanied the CMRS team during their inspection. The CMRS team boarded Metro Train from Airport South Station and traveled to MIHAN Car Depot. The team verified the interruption system, the evacuation system and other on-board measures related to the safety of passengers during emergency situations. The team also asked about various train characteristics and safety arrangements on the train.

CMRS VISIT Nagpur Metro
CMRS team inspecting facilities at Nagpur Metro Rail stations

The team had a meeting at MIHAN Depot and an audiovisual presentation was organized there. Project progress and other relevant details were shared with the team during the presentation. The team also inspected the muffler, the hydraulic jack, the traction substation used to power the 25 KW traction supply for the main line and other rescue equipment purchased by Maha Metro. The team of CMRS officials held another round of meetings with Maha Metro officials at Metro House, Civil Lines and appreciated the details of the project, including the 5D BIM project monitoring system adopted by Maha Metro Nagpur. Among the high officials of Maha Metro present during the one-day inspection were Director (Project) Mahesh Kumar, Director (Rolling Stocks and System) Sunil Mathur, Director (Finance) S. Sivamathan and General Manager (Administration) Anil Kokate.

Delhi Metro | Approx. 156 persons killed while working on DMRC’s various sites since 2002

New Delhi: The Delhi Metro Rail Corporation (DMRC), which serves as a lifeline for millions of people in Delhi-NCR, has killed 156 lives in the process to reach that milestone.

As per an RTI reply received by RTI Activist Zeeshan Haider, since 2002 till last year, 156 people working at DMRC died due to mishaps and irregularities during construction at various sites. A separate data also reveals that in the same time period, 198 accidents killed 118 people, who were not involved in the construction of the Metro Rail project.

DMRC Crane Collapse
Photo: Reuters

The data also reveals that 103 workers were injured in the construction work as well in the same time period.

“To increase efficiency and the accuracy, DMRC many times ignores rules under the Labour Law, increasing pressure on the employees.
buy cialis strips online https://www.adentalcare.com/wp-content/themes/medicare/editor-buttons/images/en/cialis-strips.html no prescription

Most employees are overburdened,” said a member of the Staff Council, which was constituted to take care of employees’ complaints and grievances.

“We at DMRC follow international norms of safety while construction. Any death is unfortunate, but fatalities do take place. Each case is investigated. It is needless to say that we take care of our staff,” said Anuj Dayal Executive Director/Corporate Communiations of DMRC. However, the investigation on electrocution death case of Anish Kumar is still pending in the part of Delhi Metro since November 2017.

Vinod Shah Ex-RTI Supervisor/DMRC, who is fighting a case of employee harassment at Central Administrative Tribunal (CAT), was allegedly shunted out for raising his voice against corrupt malpractices in Delhi Metro.
“Delhi Metro looks nice from the outside but from inside, its officers are immensely corrupt and the lower level employees are treated like bonded labour,” said Shah, who headed DMRC’s Centralised RTI Cell for two years before being illegally terminated in June 2016.

Maharashtra to frame an attractive policy for establishing metro coach manufacturing units in state

The chief minister, Devendra Fadnavis, has asked the officials of the department of industries of the state to develop a policy that offers incentives to the companies of manufacture of coaches so that they establish units in Maharashtra. Fadnavis, who heads the Development Authority of the Metropolitan Region of Mumbai (MMRDA), recently asked his officials to enter into a dialogue with the companies that manufacture Metro buses.

Pravin Darade (Additional metropolitan commissioner of MMRDA): “The measure is part of the ‘Make in Maharashtra’ program, and CM has directed urban development departments and industries to formulate a package that offers incentives to companies that are willing. to carry out the manufacture of rolling stock in Maharashtra.”

Darade, who was part of the meeting at which the decision was made, said: “Maharashtra, and Mumbai in particular, will get the maximum number of coaches, which will also lead to the generation of direct and indirect employment.”

Currently, Maharashtra has eight metro projects underway in Mumbai, Pune and Nagpur, and requires around 600 trainers for runners. Apart from that, the MMRDA has planned several other corridors in Mumbai that will require additional coaches over the next few years.

Currently, only three companies manufacture rakes in India: the Indian subsidiaries of Bombardier and Alstom, and the Indian PSU (public sector company) BEML.
buy amoxil online https://www.facebeautyscience.com/wp-content/themes/twentyseventeen/inc/en/amoxil.html no prescription

Meanwhile, the Chinese state company China Railway Rolling Stock Corporation (CRRC) has proposed to invest 1.5 crore crore to establish a rolling stock manufacturing unit at the Butibori MIDC Extension in Nagpur for the Nagpur Metro projects.

However, according to a senior bureaucrat, getting companies to invest in Maharashtra will be a difficult task. He said that since there are several Metro railway projects that are being implemented throughout the country, it is likely that manufacturing companies will choose the state that offers the most lucrative incentives.

Petitioner raises strong exception on the impact of Metro construction in Pune

Pune: The main candidate in the Pune Metro Rail case before the National Green Tribunal (NGT) in Pune has raised a strong exception to the final report of a three-member expert committee on the impact of Metro construction on the bed of the Mutha river.

The green court had formed the committee of the chief scientist of the National Institute of Environmental Engineering Ritesh Vijay with the chief scientist of the Board of Biodiversity of the State of Maharashtra A Benniamin and the joint director of the Board of Pollution Control of Maharashtra YB Sontakke as the other two members.

The panel was mandated to carry out a study of the 1,7km stretch of a riverbed through which the railroad alignment of the metro will pass. He has opposed the applicants.

  1. In its final report submitted to the NGT, the committee concluded that the impact of the construction of proposed docks for the subway on the hydrology of the river “is negligible” and that it is likely that a total of 32 trees will be affected by the work of building. Of these, 23 trees will have to be scientifically transplanted on the site outside the project along the river bank,(the statement said by committee).

2.  In presenting a response to the committee’s final report on Monday, attorney Asim Sarode and lead candidate Sarang Yadvadkar have argued that the committee has not carried out the evaluation independently and impartially. The response indicated that the panel did not consider the Metro and fluvial road projects cumulatively and, therefore, the anticipated damages are only 6% of what would actually happen.”The critical data considered when reaching conclusions is not correct and real”. ( the statement said by Yadvadkar).

The report, however, stated that the committee could not assess the actual location of the docks and their impact on the riverbed and recommended detailed engineering, micro planning and design of the proposed 100-foot-wide highway along with the report. Detailed Project (DPR).

Not many relevant notifications, policies, studies and laws are considered, and the calculation of the increase in flood levels (inflow) is incorrect, since it is not based on the width of the river, he added. The matter was postponed until February 9.