Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
26.1 C
Delhi
Friday, September 20, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

NCRTC ties up with Paytm to develop AFC system

Date:

Share post:

GHAZIABAD (Metro Rail News): The National Capital Region Transport Corporation (NCRTC) has tied up with Paytm Payments Bank Limited for which they will work with a tech firm to develop an automatic fare collection (AFC) system RRTS between Delhi and Meerut. NCRTC had awarded Paytm Payments Bank Ltd. the 82.15 km Delhi–Meerut RRTS Line‘s AFC system (Package 26B) in March.

According to the NCRTC officials the Delhi-Meerut RRTS corridor will have AFC system and QR code tickets for commuters. This fare collection system enables passengers to use their contactless credit or debit cards, mobile wallets issued by their banks for payment of their journeys while travelling via RRTS.

NCRTC official also informed that the commuters will also be able to use any National Common Mobility Card (NCMC) which is issued by any Metro or Transport Authority, or financial institution in the country.

As per this system which according to the officials is very safe and reliable, the new-age digital mobility requirements will be integrated with mobile apps, websites, closed and open-loop payments solutions, and public information kiosks cum transaction terminals.

Abha Rustagi
Abha Rustagihttps://metrorailnews.in
Abha Rustagi is working as an Assistant Editor. She has completed her post-graduation from GGSIPU Delhi.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

BEML Secures Chennai Metro’s Rolling Stock Contract ARE02A

Chennai ( Metro Rail News): On 18 September, BEML Ltd. was declared as the lowest bidder for a...

Bangalore Metro Phase 3 advances with geotechnical work 

Bangalore (Metro Rail News): SECON Pvt Ltd. initiated the geotechnical work on Magadi road for 44.65 km long...

Delhi Metro Phase 4 Advances With 2 Tunnel Breakthroughs At Magenta Line

Delhi ( Metro Rail News): On 18 September 2024, the Delhi Metro Project witnessed two milestones when Afcons...

Mr. Anil Kumar Khandelwal (Member Infra) Unveils Indian Railways’ Future Plans

Metro Rail News recently conducted an exclusive interview with Mr Anil Kumar Khandelwal, Member Infrastructure, Railway Board. During...