Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
36.1 C
Delhi
Monday, October 7, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

MMRDA invites tender for supply of Roof Top Solar PV project

Date:

Share post:

MUMBAI (Metro Rail News): Mumbai Metropolitan Region Development Authority (MMRDA) has invited Request for Proposal (RFP) from eligible bidders through MMRDA e-tendering Portal.

  • Tender Ref No: MMRDA/Metro- PIU/0002726
  • Name of Work: Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection of Suitable Structure, Testing and Commissioning of Roof Top Solar PV Project Including Operation and Comprehensive Maintenance (O and M) of the Project in RESCO Model for a Period of 25 Years at Station Site of Mumbai Metro Rail Project for Line 7 and 2A totalling around 4.43 MWp
  • EMD Fees: 100000
  • Tender Security amount: INR 8.66 Lakh
  • Completion period of the Work: 15 Months from the date of issue of LOA.
  • Tender documents sale date: From 03.03.2022 to 18.04.2022
  • Date & time of Tender Closing: From 18.04.2022 to 18.04.2022
  • Pre-bid Meeting: 21.03.2022
  • Date of opening of Tender: 19.04.2022

TENDER SCHEDULE

Sr No.Department ScheduleSupplier Activity:DurationStart Date And TimeEnd Date And Time
  1Tender Authorization and Publishing  0 Days 3 Hours 15 Minutes17/01/2019 02:45 PM  17/01/2019 06:00 PM
  2  Tender Document Download110 Days 17 Hours 59 Minutes17/01/2019 06:01 PM  08/05/2019 12:00 PM
  3  Bid Preparation and Submission110 Days 20 Hours 59 Minutes  17/01/2019 06:01 PM  08/05/2019 03:00 PM
  4Tender Closing  0 Days 3 Hours 59 Minutes  08/05/2019 03:01 PM  08/05/2019 07:00 PM
  5  Online Control Transfer of Bid0 Days 15 Hours 59 Minutes  08/05/2019 07:01 PM  09/05/2019 11:00 AM
  6Opening Envelope A – Tender Fees, EMD  0 Days 6 Hours 55 Minutes  09/05/2019 11:05 AM  09/05/2019 06:00 PM
  7Opening Envelope B – Technical Bid  0 Days 6 Hours 55 Minutes  09/05/2019 11:05 AM  09/05/2019 06:00 PM
  8Opening Envelope C – Financial Bid  0 Days 6 Hours 55 Minutes  09/05/2019 11:05 AM  09/05/2019 06:00 PM
  9Tender Award        

The MMRDA has posted the following message on the site that Tenderers are requested to note that this tender is being invited through e-procurement. Tender documents can only be obtained online from MMRDA e-Tendering Portal: https://etendermmrda.maharashtra.gov.in. For detailed information and subsequent Addendum / Corrigendum, the tenderers can log on to the above e-Tendering Portal.

Metro Line 7 from Andheri (E) to Dahisar (E) is 16.475 km. long elevated corridor with 13 stations which will provide interconnectivity among the existing Western Express Highway, Western Railway, Metro Line 1 (Ghatkopar to Versova), the ongoing Metro Line 2A (Dahisar to D N Nagar) and the proposed Metro Line 6 (Swami Samarth Nagar to Vikhroli). Whereas Metro Line 2A from Dahisar to D N Nagar is 18.589 km. long elevated corridor with 17 stations which will provide interconnectivity among the existing Western

Narendra Shah
Narendra Shahhttps://metrorailnews.in
Founder and Managing Editor at Metro Rail News - A Symbroj Media Pvt Ltd. Playing Key role in editorial activities & operation.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

KPIL – Gulermak JV Lowers Their 1st TBM At Rawatpur For Kanpur Metro Line 2

Kanpur (Metro Rail News): Another development has been waiting for the Kanpur Metro Project as Kalpataru Projects International...

PM Modi Shows Green Light To Mumbai Metro Line 3 (Aarey Colony-BKC) 

Mumbai (Metro Rail News): Prime Minister Narendra Modi has finally inaugurated the long-awaited Mumbai Metro Line 3 between Aarey...

NCRTC Initiates Train Trial Runs between Sahibabad & New Ashok Nagar RRTS Station

Delhi (Metro Rail News): The long-awaited Delhi Section of the Delhi Meerut RRTS corridor has finally advanced as...

Noida Metro Witnessed a Steady Growth in Ridership in September

Noida ( Metro Rail News): After reaching a remarkable milestone last month, Noida Metro's ridership trend is still...