Home Metro Rail Projects Kochi Metro Kochi Metro Floats Tender for Telecommunication System in Phase-II 

Kochi Metro Floats Tender for Telecommunication System in Phase-II 

Kochi Metro Floats Tender for Telecommunication System in Phase-II 
Representational Image

KOCHI (Metro Rail News): Kochi Metro Rail Limited has invited bids for the design, manufacture, supply, installation, testing, and commissioning of a comprehensive telecommunication system for Phase-II of the Kochi Metro Rail Project. 

Tender Overview

Tender NumberKBTL1/2026
Tender Issue DateMarch 9, 2026
KMRL Reference NumberKMRL/PROC/TENDER/2025-26/103
Scope of WorkDesign, Manufacture, Supply, Installation, Testing & Commissioning of Telecommunication System
Completion Period21 months from date of LOA issuance
Document DownloadFrom March 9, 2026 
Document Cost₹23,600 (including GST + processing fee, non-refundable)
Pre-Bid MeetingMarch 17, 2026 at 11:00 hrs (physical + video conference)
Query DeadlineMarch 23, 2026 by 17:00 hrs (Format per Form 11)
EMD₹86,50,000 (no MSE exemption)
Clarification Reply DateOn or before March 27, 2026
Bid Submission DeadlineApril 6, 2026 @ 15:00 hrs
Technical Bid OpeningApril 7, 2026 at 15:30 hrs

Scope of work: Design, Manufacture, Supply, Installation, Testing, and Commissioning of Telecommunication System for Phase-II of Kochi Metro Rail Project.

Kochi Metro Phase 2 (Pink Line) is an 11.2 km, 11-station elevated corridor connecting JLN Stadium to Infopark via Kakkanad. As of March 2026, construction is nearing 50% completion with viaduct installation underway. 

Also Read: Kochi Metro Invites Bids for Heavy-Duty Escalators for Phase-II


Discover how AI is bringing the next phase of sustainable urban rail mobility for Viksit Bharat at InnoMetro 2026, India’s prime exhibition and conference for metro & railways, which is going to be held on 21-22 May 2026 at Bharat Mandapam, New Delhi.Register Now: https://zma.page/ek9

Guide

Kochi Metro: the complete guide

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here