Mumbai–Ahmedabad HSR

Under Construction Operator: National High Speed Rail Corporation Limited (NHSRCL) Length: 508.17 km Updated: Official site ↗

Mumbai–Ahmedabad HSR is India’s first bullet train corridor, an under-construction 508 km line being built by NHSRCL to connect Mumbai and Ahmedabad across 12 stations. Its route map, stations, cost and latest updates are below.

The Mumbai-Ahmedabad High-Speed Rail corridor is India’s first bullet train project and the flagship of the National High Speed Rail Corporation (NHSRCL). Spanning 508 km between Maharashtra and Gujarat with 12 stations, it is designed for a top speed of 350 km/h, a step change from anything on the Indian network, and would connect Mumbai’s Bandra-Kurla Complex to Ahmedabad’s Sabarmati in roughly two hours.

The project is the only HSR corridor in India under active construction, built with Japanese Shinkansen technology and financed overwhelmingly by a concessional JICA loan. Viaduct, station and track work is advancing across Gujarat and into Maharashtra, with depots at Sabarmati, Surat and Thane.

Why it matters

Everything about India’s high-speed rail future rests on this corridor. Its cost structure, a Rs 1.1 lakh crore project underwritten largely by an 0.1%-interest Japanese loan, and its delivery timeline are the reference case every subsequent HSR proposal is measured against. Whether it opens on a realistic schedule and at what ridership will decide if the eleven other planned corridors ever move beyond DPRs.

Key facts

  • Operator: National High Speed Rail Corporation Limited (NHSRCL)
  • Length: 508.17 km, 12 stations; standard gauge
  • Speed: max 350 / operational 320 / average 250 km/h; ~2 hr end to end
  • Cost: ~Rs. 1.1 lakh crore (JICA Rs 88,000cr + GoI Rs 17,000cr + Maharashtra/Gujarat Rs 5,000cr)
  • Depots: Sabarmati, Surat, Thane
  • Target: First section (Surat, Bilimora) by 2027; full corridor by 2029

Explore more

Official source: nhsrcl.in

Latest updates

11 tenders tracked →

See all news & updates →

Phases

PhaseLinesStationsLength (km)Status
MAHSRSabarmati–Vadodara–Surat–BKC Mumbai12508.17Under Construction

Frequently asked questions

What is the status of Mumbai–Ahmedabad HSR?

As of 2026, Mumbai–Ahmedabad HSR is at the under construction stage under National High Speed Rail Corporation Limited (NHSRCL). [Verify latest with the operator.]

How long is Mumbai–Ahmedabad HSR?

Mumbai–Ahmedabad HSR has a planned/operational route length of about 508.17 km.

Who operates Mumbai–Ahmedabad HSR?

Mumbai–Ahmedabad HSR is implemented by National High Speed Rail Corporation Limited (NHSRCL).

Journey Planner & Route Map

Awarded tenders & contracts

Tender / ContractAgencyValueAwarded to
Rolling stock maintenance machinery—₹—KCS-AVADH Consortium
Track work package T-1 (final of 3 packages)—₹4467.7 CrL&T
Multi Modal Integration works: 4 Bullet Train stations in Gujarat—₹—SCC-MIRAL JV

Ongoing tenders

No ongoing tenders for this project right now.

Upcoming tenders

No upcoming tenders announced yet.