Home Metro Rail Projects DMRC to Upgrade CCTV Network with AI-Enabled, IP-based surveillance System at 76 Locations

DMRC to Upgrade CCTV Network with AI-Enabled, IP-based surveillance System at 76 Locations

DMRC to Upgrade CCTV Network with AI-Enabled, IP-based surveillance System at 76 Locations
DMRC plans to upgrade its CCTV network with AI-enabled, IP-based surveillance at 76 locations.

DELHI (Metro Rail News): The Delhi Metro Rail Corporation (DMRC) plans to replace its ageing CCTV network with a modern AI-enabled, IP-based surveillance system at 76 locations.

The upgrade will cover the Red Line between Rithala and Shaheed Sthal, the Blue Line between Noida and Dwarka Sector 21, and Line 4 between Vaishali and Yamuna Bank. Major stations included are Kashmere Gate, Tis Hazari, Rajouri Garden, Karol Bagh, Mandi House, Barakhamba Road, Anand Vihar, Vaishali and Noida City Centre. Depots, the Operations Control Centre (OCC) and the Backup Control Centre (BCC) will also be covered.

The existing network has 2,531 analogue cameras. Instead of removing everything at once, DMRC will integrate the new IP cameras with its current IP-camera system. This will provide wider station coverage and allow centralised monitoring.

The main goal is to make CCTV cameras more than just recording devices. The new system will analyse live and recorded video and automatically detect situations that may need attention.

The weekly brief metro & rail professionals read.

One email a week. We never share your address. Unsubscribe anytime.

One advanced feature is person tracking. If an operator marks a person of interest, the system can search footage using details such as gender, clothing colour, age group or an uploaded photograph. It can then follow that person’s movement across multiple cameras and create a clear route and timeline.

Other AI video-analytics features include detection of overcrowding, long queues, track intrusion, falling objects and loitering.The entire work is expected to be completed within one year. After installation, the new system will have a five-year defect liability period.

Also Read: Delhi Master Plan 2047: 695 km metro and 6 RRTS lines

Guide

Delhi Metro: the complete guide

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here