Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian Railways
35.1 C
Delhi
Thursday, October 3, 2024
Fluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 PromotionFluid Controls InnoTrans 2024 Promotion
APL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian RailwaysAPL APOLLO Steel Pipes - Powering the Future of Indian Railways

Aerial view of upcoming CST metro station on the Metro 3 line

Date:

Share post:

MUMBAI (Metro Rail News): Mumbai Metro Rail Corporation Limited (MMRCL) has released a video capturing the Aerial view of the upcoming CST metro station on the Metro 3 line.

Mumbai Metro Rail Corporation Limited (MMRCL) shares the video from their official Twitter handle last Saturday, which is executing the 33.5 km Colaba-Bandra-SEEPZ line.

The 1.25-minute video captures the magnitude of the 250-meter long station, which will have 6 entry and exit points connecting major establishments in the vicinity like MCGM headquarters, CST station, Press Club, Sir JJ School of Arts, Metro Cinema.

Breathtaking visuals of our upcoming CST metro station. This is 250 m long station with 6 entry & exit points connecting major establishments in the vicinity like MCGM HQ, CST CR stn, Press Club, Sir JJ School of Arts, Metro Cinema,

This video has been viewed around 15,000 times as of publishing this report and garnered positive reviews from netizens.

Despite its significance, the Metro 3 has garnered a lot of negative publicity in recent times over its plan to construct a car shed in Aarey Colony.

The decision, which entails the felling or transplanting of nearly 2,700 trees, has been opposed by activists and citizens. However, MMRCL wasted little on felling a majority of trees after the Bombay High Court dismissed petitions opposing the move.

The case is currently in the Supreme Court, with the next hearing scheduled on October 21. However, MMRCL has already cut about 98 percent of trees required to construct the car shed.

Aradhana Patel
Aradhana Patelhttps://metrorailnews.in
She is an Engineering graduate and passionate about writing technical news.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.

spot_img

Related articles

Mumbai Metro Line 5 Advances With Successful Erection Of Two Spans 

As per the press release by MMRDA We are thrilled to announce a significant milestone in the ongoing...

RITES & DMRC sign MoU for exploring Metro works 

As per the release RITES Ltd., a leading transport infrastructure consultancy, on 3 October 2024 signed a Memorandum...

11 Firms Submit Bids For Lucknow Metro Line-2’s Geotechnical Contract

Lucknow (Metro Rail News): A total of Eleven firms have submitted bids to carry out geotechnical soil investigation...

MMRCL Floats Tender for Thane Metro’s General Consultant Contract

Thane (Metro Rail News): Maharashtra Metro Rail Corporation Ltd. ( MMRCL) floated a tender for appointing a general...