MUMBAI (Metro Rail News): Univastu India has secured an electrical & mechanical works contract worth ₹391.76 Crores for Mumbai Metro Line 4 & Line 4A. The 32.32 km Mumbai Metro Line 4 (Wadala to Kasarvadavali) and its 2.7 km extension, also known as Line 4A (Kasarvadavali to Gaimukh), form the “Green Line,” a major elevated corridor connecting central Mumbai (Wadala) through Thane to the northern suburbs.
Originally, Mumbai Metropolitan Region Development Authority (MMRDA) awarded the Package CA-298 of Mumbai Metro to Larsen & Toubro (L&T). But now L&T has subcontracted this package to Univastu India.
Contract’s Scope of Work: The contract includes the Construction of Design, Manufacture, Supply, Installation, Integration, Testing and Commissioning of Electrical & Mechanical works including 5 Years of Comprehensive Maintenance after 2 years of Defect Liability Maintenance Period for Mumbai Metro Line 4 and Extension Corridor (4a) of MMRDA against CA-298.
The Scope also covers training, DLMP & CMP including supply of spares, special tools, testing and diagnostics equipment, jigs and fixture etc. for maintenance and repairs of the E&M for 32 Stations at main line and Depot for 5 Years of Comprehensive Maintenance after 2 years of Defect Liability Maintenance Period for Mumbai Metro Line 4 & 4A project-– E&M Works (22 Stations & 1 Depot).
Also Read: https://metrorailnews.in/electrification-contract-of-mumbai-metro/
Discover how AI is bringing the next phase of sustainable urban rail mobility for Viksit Bharat at InnoMetro 2026, India’s prime exhibition and conference for metro & railways which is going to held on 21-22 May 2026 at Bharat Mandapam, New Delhi.
Register now: https://innometro.com/visitor-registration/








