
LUCKNOW (Metro Rail News): Last week, two firms submitted proposals to re-engineer the Automatic Fare Collection (AFC) system for Lucknow Metro Phase 1 from a closed-loop to an open-loop system (Package LKS-04).
When Line-1’s initial 8.5 km section connecting Transport Nagar and Charbagh opened in September 2017, the original AFC system installed by Datamatics & Mikroelektronika was installed and inaugurated.
Subscribers only
Continue reading this tender report
Full tender news is for subscribers. Start a 15-day free trial to read the rest. No card needed, and it does not auto-charge.
Already subscribe? Sign in · See all plans




Sarvesh Mishra
Tata TCL Fibre
engineer
Tata TCL Fibre engineer
Tata TCL Fibre engineer
95558 86770