Home Latest News National Afcons–SAM JV Bags Rs. 1087.67 cr Underground Contract of Kanpur Metro Phase 1

Afcons–SAM JV Bags Rs. 1087.67 cr Underground Contract of Kanpur Metro Phase 1

2
3,541
Afcons–SAM JV Bags Rs. 1087.67 cr Underground Contract of Kanpur Metro Phase 1
Image for representational purpose only

KANPUR (Metro Rail News): After the Uttar Pradesh Metro Rail Corporation (UPMRC) invited financial bids, Afcons Infrastructure – SAM India JV emerged as the lowest bidder for constructing Kanpur Metro Phase 1’s second underground section (KNPCC-06) between Nayaganj Station and Transport Nagar Ramp.

This section of the 23.785-kilometre Line-1 (IIT – Naubasta), which includes three underground stations at Kanpur Central, Jhakarkatti, and Transport Nagar, is estimated to be 4.65 kilometres long. It will consist of six tunnel boring machine (TBM)-bored tunnels,  for which a minimum of two machines must be deployed.

2 COMMENTS

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here