Home Latest News SYSTRA Gets Contract for GC for Systems of Mumbai Metro Line-5-7A

SYSTRA Gets Contract for GC for Systems of Mumbai Metro Line-5-7A

0
823
SYSTRA Gets Contract for GC for Systems of Mumbai Metro Line-5-7A
Photo Copyrighted: MMRDA

MUMBAI (Metro Rail News): SYSTRA MVA Consulting (India) Pvt. Ltd. in January won the General Consultant (GC) service contract for system works of Mumbai Metro’s 24.9 km Orange Line-5 (Thane – Bhiwandi – Kalyan), 3.17 km Red Line-7A (Andheri East – CSIA Terminal-2) and 11.38 km Red Line-9 (Dahisar East – Mira Bhayander) according to a news report.

SYSTRA’s selection among 5 bidders was made on the Quality cum Cost Basis System (QCBS) method in which the winner’s selection is made through a combination of points scored in the technical and financial evaluation as per a recent development.

Scope of the work includes Appointment of General Consultant for system works of Part of the corridor of Metro Line 5 (Thane-Bhiwandi-Kalyan), Metro Line 7A(Andheri (E) to CSIA), Metro Line 9 (Dahisar(E) to Mira Bhayander.

Guide

Mumbai Metro: the complete guide

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here