Home Latest News Patna Metro’s Underground Construction Bid Attracts Four Bidders

Patna Metro’s Underground Construction Bid Attracts Four Bidders

1
682
Patna Metro’s Underground Construction Bid Attracts Four Bidders
Image for representation purpose only

PATNA(Metro Rail News): Four construction firms have submitted tenders (bids) to build the only underground package (PC-03) of Patna Metro’s 14.05 km Line-2 which will connect Patna Junction Railway Station and New ISBT through 12 stations according to a news report.
After Phase 1’s Package PC-01 where NCC started piling work in December, the roughly 8 km package PC-03 is the second (and final) civil package of Line-2 and comprises of 6 underground stations. A station planned at Prem Chand Rangashala between Moin Ul Haq Stadium and University stations was dropped from the plans in 2020.
DMRC had invited tenders for PC-03 in September with an estimate of Rs 1958.81 crore and expects the assigned contractor to complete work in 42 months.
The bidders are Afcons Infrastructure, ITD Cementation India Ltd., Larsen & Toubro (L&T) and Tata Projects Ltd. (TPL).
Scope of the works include Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground Ramp at Rajendra Nagar and Six Underground metro stations viz. Rajendra Nagar, Moin Ul Haq Stadium, University, PMCH, Gandhi Maidan & Akashvani with Entry/Exits & Connecting subway including Architectural Finishing, Water Supply, Sanitary Installation & Drainage works on New ISBT to Patna Station of corridor-2 of Phase-I of Patna Metro.

1 COMMENT

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here