NAGPUR (Metro Rail News): Maharashtra Metro Rail Corporation Limited, on behalf of CIDCO (City and Industrial Development Corporation of Maharashtra), has invited tenders for the construction of balance works on six elevated stations for Navi Mumbai Metro Line-1.
Name of Work
Design (part) and construction of balance works of Concrete & Fabricated Steel Structures, Architectural works, Plumbing and Sewerage etc. of Six Nos. of Elevated Metro Stations at Kharghar Village, Kendriya Vihar, Utsav chowk, Belpada, RBI Colony & Belapur Terminal Station for Navi Mumbai Metro Line-1. (On behalf of CIDCO)
Important Details
Tender Number: NM1-C-01/2021
Estimated Cost: INR 103.65 Crores
Completion Period: 12 Months
Availability of Tender Documents: From 09/04/2021 at 16:00 Hrs to 07/05/2021 till 16:00 Hrs
Pre-Bid Meeting: 20/04/2021 at 11:00 Hrs
Tender submission Date: Online submission till 07/05/2021 up to 16:00 Hrs
Tender Opening Date: 07/05/2021 after 16:30 Hrs
Scope of Work
The work content against the Item rate component of the work shall be as per details given below –
Design & Construction of the balance works of the Station buildings, platforms (approx. 140 m length for typical station & approx.172 m length for Belapur terminal station), including balance work of Viaduct portions for the track within the station limits, platform roof structures including sheeting, concourses (approx.143 m length for elevated concourse of typical stations & approx.172 m length for Belapur terminal station), parking facilities, architectural finishes, Accesses works, signage’s, station E & M works including power distribution, illumination, fire /smoke detection, alarm & suppression works, landscaping, plumbing works, water supply, soil waste, vent, sewage, storm and drainage arrangement for Stations at Kharghar Village, Kendriya Vihar, Utsav Chowk, Belpada, RBI Colony & Belapur Terminal Station for Navi Mumbai Metro Line-1
The scope of work in brief includes –
The work against the Item-rate contract comprises Design (Part) and construction of balance works for Concrete & Fabricated Steel Structures, Architectural works, Electrical & Mechanical works, Plumbing and Sewerage of Six Nos. of Elevated Metro Stations at Kharghar Village, Kendriya Vihar, Utsav Chowk, Belpada, RBI Colony & Belapur Terminal Station for Navi Mumbai Metro Line-1.
The scope of work shall include detailed survey of the Station locations and surrounding areas & allied facilities, soil investigation and locating piles (if required), pile-caps and open foundations as needed for the stations access works avoiding shifting of utilities as required; Compliance of all Safety and QA/QC measures as per Annexure-3 of Vol-II(A),detailed designs of Balance components of station buildings and related works.
For more details and further information on scope of works, applicants can download tender documents from the website – https://mahametrorail.etenders.in
Navi Mumbai Metro Line-1 under Phase-1 consist of elevated corridor of length of 11.1 Km from Belapur to Pendhar with 11 stations namely – Belapur terminal, RBI Colony, Belapada, Utsav Chowk, Kendriya Vihar, Kharghar Village, Central Park, Pethpada, Amandoot, Pethali Taloja and Pendhar.
CIDCO has appointed Maha Metro to complete the remaining work of Navi Mumbai Metro Line-1 which has already been delayed due to multiple reasons.
According to CIDCO officials, the commercial operation between station 7-11 (Central Park to Pendhar) and between station 1-6 (Belapur to Kharghar sector 14) is scheduled tentatively by the end of December 2021 and December 2022 respectively after seeking certification from Commissioner, Metro Rail Safety (CMRS).
Stainless steel supply and fixing work iron supply and fixing work