PUNE (Metro Rail News): The long-awaited construction activity has finally started on the metro extension between Vanaz and Chandni Chowk in Pune. The 1.5 km elevated stretch is a part of Pune Metro Line 2 (Aqua Line). The stretch is expected to improve connectivity in the city’s western areas. It will have two stations – Korthud Depot and Chandni Chowk. As of now, the metro service is operational between Vanaz and Ramwadi. This extension will push the network further towards Chandni Chowk. It is a major entry point to the city and a busy traffic junction.
Work Status on Ground
An official mentioned that the initial work has started near the Chandni Chowk area. This includes soil testing and surveys. An agency was appointed last month to build the flyover and the station structure. Officials said the work will be carried out in phases. Barricading will be placed carefully so that traffic movement is not badly affected.
Project Details
What else is planned
- A flyover will be built near Kothrud Depot along with the Metro line
- A foot overbridge is being designed at Chandni Chowk for safe crossing
Right now, people from Kathrud and nearby areas have to travel to Vanaz station by auto or bike to catch the Metro. There is no direct access beyond this point. Many commuters say the line should have been extended earlier, as Chandni Chowk is an important area.
Once ready, the extension will make it easier for the people living in western Pune to access the Metro and reduce travel time on busy roads.
Also Read: Mumbai Monorail returns to track: MMMOCL awards O&M Contract to Power Mech
Also Read: Mumbai Water Metro Project gains momentum with consultancy tender for terminal development
Discover how AI is bringing the next phase of sustainable urban rail mobility for Viksit Bharat at InnoMetro 2026, India’s prime exhibition and conference for metro & railways, which is going to be held on 21-22 May 2026 at Bharat Mandapam, New Delhi.
Register Now: https://zma.page/ek








