Home Metro Rail Projects Mumbai Metro Mumbai Metro | MMRC lowers second TBM Vaitarna-3 in Mumbai Metro 3 UG section

Mumbai Metro | MMRC lowers second TBM Vaitarna-3 in Mumbai Metro 3 UG section

1
802
Mumbai Metro | MMRC lowers second TBM Vaitarna-3 in Mumbai Metro 3 UG section
Listen to this story
0:00

Mumbai: The Mumbai Metro Rail Corporation (MMRC) today lowered its second Tunnel Boring Machine (TBM) at Mumbai Metro-3 package-2 in Azad Maidan for its north bound drive towards Mumbai Central.

Here are some photographs of event shared by the MMRC:

MMRC lowered second Tunnel Boring Machine (TBM) at Azad Maidan
MMRC lowered second Tunnel Boring Machine (TBM) at Azad Maidan

MumbaiMetroTBM2
MMRC lowered second Tunnel Boring Machine (TBM) at Azad Maidan (Photo source: MMRC)

ltRead nextL&T Awards ₹23.74 Cr Contract to Univastu India for Mumbai Metro Line 4 & 4A 18 Sep 2026

Add Metro Rail News as a preferred source on Google

1 COMMENT

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here