Home Metro Rail Projects Navi Mumbai Metro Maharashtra CM Devendra Fadnavis flags off the trial run of Navi Mumbai Metro Line-1

Maharashtra CM Devendra Fadnavis flags off the trial run of Navi Mumbai Metro Line-1

1
811
Maharashtra CM Devendra Fadnavis flags off the trial run of Navi Mumbai Metro Line-1

This article has not been translated yet, so the English original is shown below. Translate now (takes a few seconds).

Navi Mumbai (Metro Rail News): Maharashtra Chief Minister Devendra Fadnavis on September 11, 2019, has officially flagged off the trial test run of Navi Mumbai Metro from Taloja Depot. The 3-coach trains run on 2-km long distance from Pendhar Metro terminal yard at Taloja to Pendhar station. The section is part of 11.1 km long Belapur-Pendhar corridor (Line 1).

Navi Mumbai Metro Line 1 (Belapur-Pendhar corridor) is consists of a total of 11 stations and is expected to be operational by mid-2020. A total of three-coach 8 trains will be run between Belapur and Pendhar stretch.

On August 29, an internal trial test run of 3-coach metro train was conducted inside the metro yard at Taloja.

Get the Daily Metro & Rail Brief

Join 125,000+ metro and rail professionals. Project updates, new tenders and contract awards from across India, in your inbox every day.

Free · One email a day · Unsubscribe anytime · We never share your address

In March 2019, CIDCO had received 2 three-coach metro trainsets for Navi Mumbai Metro from Chinese rolling stock manufacturer China Railway Rolling Stock Corporation (CRRC).

Line 1, which is built at an estimated cost of Rs 3,063 crore, is part of the phase I network of future lines of Navi Mumbai Metro rail project which will connect the upcoming international airport.

SponsoredInnoBus Conference & Expo 2026, 23 December 2026, Bharat Mandapam, New Delhi

In June 2019, Board of Directors of City & Industrial Development Corporation of Maharashtra Limited (CIDCO) had accorded principle approval to appoint Delhi Metro Rail Corporation Limited (DMRC) to undertake the work of Line 2 & 3 of Navi Mumbai Metro rail project.

The Detailed Project Report (DPR) for Line 2 & 3 of Navi Mumbai Metro rail project had been submitted by RITES Limited. The CIDCO Board had accorded approval to implement Line 3 (Pendhar to MIDC) for Rs 1750.14 crore and Line 2 (MIDC to Khandeshwar) for Rs 2820.20 crore.

A total of 26.26 km metro rail network consists of four lines will be built under the Navi Mumbai Metro project with an estimated cost of Rs.8,904 crore.

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here