Featured

Delhi Metro’s Inderlok-Indraprastha line moves ahead: Kalpataru-SOMA JV bags civil contract

DELHI (Metro Rail News): Delhi Metro Rail Corporation (DMRC) has issued the Letter of Acceptance (LOA) to M/s Kalpataru-SOMA Joint Venture for Contract D2C-06, the design and construction of...

Shri Shalabh Goel takes charge as full- time NCRTC MD after exiting railways

DELHI (Metro Rail News): The central government has cleared the permanent appointment of Shri Shalabh Goel as Managing...

Ghaziabad eyes 16km metro link to Delhi via Hindon Airport, DPR in progress

DELHI(Metro Rail News): A new metro corridor could soon connect Ghaziabad directly to northeast Delhi. It will improve...

Delhi Metro Phase 5A enters construction phase: DMRC awards ₹1,024 Cr Central Vista Contract to Cemindia

NEW DELHI (Metro Rail News): Delhi Metro Rail Corporation (DMRC) has formally issued the Letter of Acceptance (LOA)...

Bengaluru Metro’s non-fare income climbs sharply, touches Rs 145 crore mark

BENGALURU(Metro Rail News): Bengaluru Metro Rail Corporation Limited has sharply increased its non-fare revenue. Its Earnings rose from...
spot_img

How Electronic Ticket Control Database technology (ETCD) is helpful

A system for the real-time management of information & ticket exchange technology has been enabled for interfacing with travellers. This new technology is known...

Possible challenges and way ahead for Metro Rail Organization Post Lockdown

Covid-19 has changed everything around us. Our Financial decisions, our moral values and most importantly, it has changed the way think. We all know...

It’s possible to unlock safe urban mobility during a lockdown

Nowadays, the most challenging question is whether it is possible to permit mobility of workers from their house to the workplace to commence production...

MMRDA invites S&TC and PSD bid for Line 4 and Its Extension Corridor

MUMBAI (Metro Rail News): Mumbai metropolitan region development authority (MMRDA)invites Open E-tenders from eligible bidders for Main Line and Depot of Mumbai Metro Line...

InnoTrans to take place from 27 to 30 April 2021

On 21 April 2020, in order to contain the spread of SARS-CoV-2 the Senate of Berlin imposed a ban on staging large events, in...

RLDA to conduct the online pre-bid meeting for the Redevelopment of New Delhi Railway Station

NEW DELHI (Metro Rail News): In a first of kind move to carry out work seamlessly amidst the COVID19 pandemic, Rail Land Development Authority...
spot_img