Staff Reporter

Exclusive Content

spot_img

ADB and JICA starts evaluating loan proposals for Delhi – SNB RRTS line

NEW DELHI (Metro Rail News): The Asian Development Bank (ADB) and Japan International Cooperation Agency (JICA) this year saw the start of loan proposal...

RVNL wins contract for construction of Surat Metro’s Bhesan Depot

SURAT (Metro Rail News): Rail Vikas Nigam Ltd. (RVNL) has been given a contract worth Rs. 198.93 crores for the civil construction of the...

NHSRCL floats bid for Thane Rolling Stock Depot of MAHSR Corridor

MUMBAI (Metro Rail News): NHSRCL invites bids for Thane Rolling Stock Depot (Package MAHSR D-1). This package includes the Design and Construction of Thane...

WB first Vande Bharat train to be flag-off by PM on 30th December

KOLKATA (Metro Rail News): On December 30, Prime Minister Narendra Modi will inaugurate a new Vande Bharat Express train that will run from Howrah...

All you need to know about India’s Frist Hydrogen Train: Vande Metro

NEW DELHI (Metro Rail News): The Indian Railways are now manufacturing the Vande Metro train. The design would replace the design created in the...

Feasibility studies for some routes of Diamond Quadrilateral undertaken

NEW DELHI (Metro Rail News): Ministry of Railways has undertaken feasibility studies for some routes of the Diamond Quadrilateral, namely Delhi-Mumbai, Delhi-Kolkata, Mumbai-Chennai, Mumbai-Nagpur...