Overview
Delhi Metro Rail Corporation Limited (DMRC) is a Special Purpose Vehicle (SPV) entrusted with the responsibility of implementation of Delhi Metro Rail Project. DMRC was registered on 3rd May 1995 under the Companies Act, 1956 with equal equity participation of the Government of the National Capital Territory of Delhi (GNCTD) and the Government of India.
Operational Lines (Phase-I, II & III Network) – 230.18 km
- Red Line#1 (Dilshad Garden – Rithala) – 25.09 (21 Stations)
- Yellow Line#2 (Samaypur Badli – HUDA City Centre) – 49.31 (37 Stations)
- Blue Line#3 (Noida City Centre – Dwarka Sector 21) – 49.84 (44 Stations)
- Blue Line#4 (Yamuna Bank – Vaishali) – 8.74 (7 Stations)
- Green Line#5 (Inderlok – Mundka) – 15.14 (14 Stations)
- Green Line#5 (Ashok Park Main – Kirti Nagar) – 3.32 (2 Stations)
- Violet Line#6 (Kashmere Gate – Escorts Mujesar) – 43.40 (32 Staions)
- Magenta Line#8 (Botanical Gardan – Kalkaji Mandir) – 12.64 (9 Stations)
- Orange Line – Airport Express Line (New Delhi – Dwarka Sector 21) – 22.70 (6 Stations)
Operation Route Map (Phase-I, II & III)
Under Construction Lines (Phase-III & IV) – 132.768 km
- Violet Line #6 Extn. (Badarpur – Ballabhgarh) – 075 (11 Stations) – EDC (June 2018)
- Gray Line #9 Extn. (Dwarka – Najafgarh) – 4.295 (3 Stations) – EDC (December 2018)
- Blue Line #3 Extn. (Noida City Centre -Noida Electronic City) – 6.675 (6 Stations) – EDC (March 2018)
- Green Line #5 Extn. (Mundka – Bahadurgarh City Park) – 11.182 (7 Stations) – EDC (March 2018)
- Pink Line #7 (Majlis Park – Shiv Vihar) – 58.596 (38 Stations) – EDC (June 2018)
- Magenta Line #8 (Janakpuri West – Kalakaji Mandir) – 25.595 (16 Stations) – EDC (March 2018)
- Red Line #1 Extn. (Dilshad Garden – New Bus Adda) – 9.41 (6 Stations) – EDC (June 2018)
Operational Metro Depots
- Shastri Park Depot (Red Line #1) – 31 Trains
- Khyber Pass Depot (Yellow Line #2) – 32 Trains
- Sultanpur Depot (Yellow Line#2) – 28 Trains
- Najafgarh Depot (Blue Line #3) – 35 Trains
- Yamuna Bank Depot (Blue Line #3) – 35 Trains
- Mundka Depot (Green Line#5) – 16 Trains
- Sarita Vihar Depot (Violet Line #6) – 12 Trains
- Ajronda Depot (Violet Line #6) – 12 Trains
- Kalindikunj Depot (Magenta Line #8) – 30 Trains
- Dwarka Depot (Airport Line) – 7 Trains
Under Construction Metro Depots
- Mukundpur Depot (Pink Line #7)
- Vinod Nagar Depot (Pink Line #7)
- Samaypur Badli Depot (Yellow Line #2)
- Bahadurgarh Depot (Green Line #5)
Major Contractors
Contract Package | Description of work | Contract Awarded to |
MC1A | Design and Construction of civil work and Ventilation& Air Conditioning Work for metro Corridors (Vishwa Vidyalaya ISBT Section) | Kumagai Gumi Co. Ltd.(Japan), Skanska (International Civil Engineering), AB Sweden, Hindustan Construction Co. Ltd. India, Itochu Corporation (Japan) |
MC1B | Design and Construction of civil work and Ventilation& Air Conditioning Work for metro Corridors (ISBT – Central secretariat) | Dyckerhoff & Windmann AG, Germany, Shimizu Corporation (Japan), Larsen & Turbo Ltd.(India), Samsung Corporation (Korea), IRCON International Ltd. (India) |
RS1 | Design, Manufacture, Supply and Commissioning of Rolling Stock for Metro & Rail corridors | Mitsubishi Corporation (Japan), KOROS (Korea), Mitsubishi Electric Corporation (Japan) |
SYS1 | Signaling / Train Control and Communication System for Metro and rail Corridors | Alstom Transport Ltd. (India), Alstom Transport SA (France), Alcatel Portugal SA, Sumitomo Corporation (Japan) |
SYS2 | Traction Power, Power Distribution and SCADA System for Metro Corridors | IRCON International Ltd. (India), Cobra (Spain), ELIOP (Spain) |
SYS4 | Automatic Fare Collection System for Metro Rail Corridors | Alcatel CGA Transport (France) |
RC- 7A | Supply, Installation, Testing and Commission of Traction Electrification, Power Supply, Power Distribution and SCADA System for Rail Corridors | ABB Ltd. (India), Best & Crompton, Engineering Ltd. (India) |
RC3 | Supply, Installation, Testing and Commissioning of ballast less Track for Rail Corridors | IRCON International Ltd. (India), MVM Rail Pty. (Australia) |
Rolling Stock Contractors
Contract | Manufacturer | No of Coaches | App Contract value (INR) |
RS1 | Koros /Hyundai Rotem (South Korea) | 240+40* | 1731 Cr. |
RS2 | Bombardier Transportation Germany | 340+84* | 2983 Cr. |
RS3 | Hyundai Rotem South Korea | 156+40* | 1384 Cr. |
RS4 | BEML Bangalore | 64 | 52 Cr. |
RS5 | Bombardier Transportation Germany | 74+40* | 811 Cr. |
RS6 | BEML Bangalore | 136 | 930 Cr. |
RS7 | Bombardier Transportation Germany | 76 | 545 Cr. |
RS9 | BEML /Hyundai Rotem | 162 | 1332 Cr. |
RS10 | Hyundai Rotem South Korea | 486+18* | 4277 Cr. |
RS11 | Bombardier Transportation India | 162 | 1500 Cr. |
RS13 | BEML Bangalore | 96 | 847 Cr. |
C