
MAHARASHTRA (Metro Rail News): Amravati Railway Station is soon to become India’s largest railway hub with features like a modern air transport station. The Amravati Railway Station Project is aimed to be finished within the next 2-3 years and carries a completion cost of around Rs 2,245 crore.
Andhra Pradesh Capital Region Development Authority (AP CRDA) has begun acquiring land for the plan, with 80% of land assessment and acquisition already completed.
Modern features of Amravati Railway Station
- 24 platforms and 4 terminals with advanced features similar to airports.
- Comfortable waiting lounges, digital ticketing systems and automated entry gates.
- Solar panels will be installed across the station’s roof, platform walls and parking area to generate native electricity source.
- LED lighting, ceiling fans, and a central air conditioning system will be installed to make the long journeys comfortable and easy.
- Smooth railway tracks allowing trains to glide through smoothly and faster.
- To prevent accidents and unprecedented situations, automatic train protection system shields will be used.
- The rail route is designed using high-resolution satellite data to make the route less prone to moisture damage since Krishna river is located near to the station.
The Amravati railway station will span across the area of 1,500 acres and will cater to the needs of almost 3 lakh riders everyday. It will also provide connectivity to far routes like Mumbai and Kolkata, enabling travellers an affordable transit option for longer journeys.
2 Bullet Trains across the Amravati rail link will provide faster ridership
As mentioned by NDTV, Hyderabad-Chennai and Hyderabad-Bengaluru bullet trains will pass through the Amravati station route, allowing a faster and easy passage to major South Indian cities. The route across Hyderabad, Chennai and Bengaluru will be covered in following reduced time:
Get the Daily Metro & Rail Brief
Join 125,000+ metro and rail professionals. Project updates, new tenders and contract awards from across India, in your inbox every day.
| Bullet Train Routes | Travel Duration |
| Hyderabad-Chennai | 112 minutes |
| Chennai-Hyderabad | 70 minutes |
| Hyderabad-Bengaluru | 2 hours |
3 major developments along the Amravati Railway Station
- 3.2-kilometre-long railway bridge over the Krishna River: The bridge will be connected with unparalleled engineering for the smooth mobility along the Amravati rail route, making it one of the longest bridges.
- 57-kilometre broad-gauge railway line: The railway line will be constructed between the regions of Errupalem, Amaravati, and Namburu to connect the Amaravati region with the rail network.
- Metro line to connect Amravati: The metro route will enhance mobility and connectivity with local areas of Amravati.
To make the area along the Amravati station and railway bridge over Krishna river moisture-resistant, the method of floodproofing using 100 years of satellite data is being implemented.
The Amravati railway development project will provide faster and greener transit options, reducing heavy dependence on road transport and deducting travel time. Once the transformation journey at Amravati gains enough traction to be finally opened for public utilisation, it will provide more accessible options to all the passengers to undertake comfortable longer journeys.
Also Read: Indian Railways Approves Weekly Train Between Nepal’s Janakpur Dham and Ayodhya
Read nextKolkata Metro Orange Line to Become Driverless Once the Stretch Extends till Sector V14 Nov 2026Get alerts for big metro and rail stories Openings, trials, fares and approvals. Two or three a day at most; turn them off any time.




