Home Latest News Ahmedabad Metro Phase 2’s Package C2 goes to Ranjit Buildcon

Ahmedabad Metro Phase 2’s Package C2 goes to Ranjit Buildcon

0
1,390
Ahmedabad Metro Phase 2’s Package C2 goes to Ranjit Buildcon
Image for representation.

AHMEDABAD (Metro Rail News): Ranjit Buildcon has emerged as the lowest bidder for constructing the 6.478 km Package C2 of the 28.254 km Ahmedabad Metro Phase 2 project after Gujarat Metro Rail Corporation opened financial bids submitted by 9 firms.
Phase 2 involves the construction of two elevated corridors, as an extension of Phase 1’s 18.522 km Line-2 (Red Line), northwards from Motera Cricket Stadium towards GNLU and onward to Mahatma Mandir in Gandhinagar. At GNLU Station, a short 5.42 km spur line will connect to GIFT City across the Sabarmati River.
GMRC had invited bids for the work with a deadline of two and a half months. The estimated cost of the project is Rs 470 Crores.

Bid Details


Ranjit Buildcon Ltd. – Rs 417.90 Crores

Dilip Buildcon Ltd. – Rs 465.26 Crores

The weekly brief metro & rail professionals read.

One email a week. We never share your address. Unsubscribe anytime.

Sadbhav Engineering Ltd. – Rs 466.27 Crores

Afcons Infrastructure Ltd. – Rs 506.37 Crores

JMC Projects India Ltd. – Rs 509.93 Crores

Larsen & Toubro Ltd. – Rs 515.45 Crores

GR Infraprojects Ltd. – Rs 530.75 Crores

The Scope of the work includes Construction of 6.478km elevated viaducts and 5 stations from CH. 25467.443m to 31945.443m and 0.679 km elevated viaducts and ramp for depot entry in connection with Phase – II of Ahmedabad Metro Rail Project from Motera Stadium to Mahatma Mandir (Except E&M, architectural finishing and roofing).

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here