As of 19 Oct 2026, Chennai Metro Line 4 (Yellow Line) is operational (since 11 Oct 2026). Latest news: 15 Oct 2026.
Chennai Metro Line 4, the Yellow Line, is a 26.1 km Phase 2 CMRL corridor from Light House to Poonamallee Bypass. Its first section, about 15 km from Poonamallee Bypass to Vadapalani with 11 elevated stations, opened on 11 October 2026. Trains run from 7 am to 9 pm, every 10 minutes at peak, with fares of ₹10 to ₹40. The underground section to Light House is under construction.
Line 4 gives Chennai's western suburbs, including Poonamallee, Iyyappanthangal and Porur, their first metro link to the city centre, an alternative to the congested Arcot Road corridor. It is the first Phase 2 line to carry passengers and the first CMRL line built for driverless operation, with platform screen doors on its elevated stations. It connects with the Green Line at Vadapalani today and, once complete, will link the Blue Line at Nandanam, Line 3 at Thirumayilai and suburban rail at Kodambakkam.
The 27 stations below run from Light House to Poonamallee Bypass. Interchanges are listed where a station connects with another line or a railway station.
| # | Station | Type | Connects to |
|---|---|---|---|
| 1 | Light House (under construction) | Underground | |
| 2 | Kutchery Road (under construction) | Underground | |
| 3 | Thirumayilai (under construction) | Underground | Line 3 (Purple Line, under construction) / Thirumayilai MRTS station |
| 4 | Alwarpet (under construction) | Underground | |
| 5 | Bharathidasan Road (under construction) | Underground | |
| 6 | Boat Club (under construction) | Underground | |
| 7 | Nandanam (under construction) | Underground | Line 1 (Blue Line) |
| 8 | Panagal Park (under construction) | Underground | |
| 9 | Kodambakkam (under construction) | Underground | Kodambakkam suburban railway station |
| 10 | Kodambakkam Power House (under construction) | Elevated | |
| 11 | Vadapalani | Elevated | Line 2 (Green Line), via link bridge |
| 12 | Saligramam (under construction, trains pass without stopping) | Elevated | |
| 13 | Avichi School (Virugambakkam South) (under construction, trains pass without stopping) | Elevated | |
| 14 | Alwarthirunagar (under construction, trains pass without stopping) | Elevated | |
| 15 | Valasaravakkam (under construction, trains pass without stopping) | Elevated | |
| 16 | Karambakkam (under construction, trains pass without stopping) | Elevated | |
| 17 | Alapakkam (under construction, trains pass without stopping) | Elevated | |
| 18 | Porur Junction | Elevated | |
| 19 | Porur Bypass | Elevated | |
| 20 | Thelliyaragaram | Elevated | |
| 21 | Iyyappanthangal | Elevated | |
| 22 | Kattupakkam | Elevated | |
| 23 | Kumananchavadi | Elevated | |
| 24 | Karayanchavadi | Elevated | |
| 25 | Poonamallee Government Hospital | Elevated | |
| 26 | Poonamallee Bus Stand | Elevated | |
| 27 | Poonamallee Bypass | Elevated |
| Section | Stations | km | Status | Opened or expected |
|---|---|---|---|---|
| Poonamallee Bypass to Vadapalani | 11 | 14.6 | Operational. 11 elevated stations served; 6 intermediate stations (Alapakkam to Saligramam) under construction | 2026-10-11 |
| Vadapalani to Light House | 10 | 11.5 | Under construction (Kodambakkam Power House elevated, 9 underground stations listed by Wikipedia) | expected 2028 |
Official source: chennaimetrorail.org
| Phase | Lines | Stations | Length (km) | Status |
|---|---|---|---|---|
| Poonamallee Bypass to Vadapalani | Poonamallee Bypass to Vadapalani | 11 | 14.6 | Operational. 11 elevated stations served; 6 intermediate stations (Alapakkam to Saligramam) under construction |
| Vadapalani to Light House | Vadapalani to Light House | 10 | 11.5 | Under construction (Kodambakkam Power House elevated, 9 underground stations listed by Wikipedia) |
Chennai Metro Line 4 (Yellow Line) fares range from ₹10 to ₹50, set by Chennai Metro Rail Limited (CMRL); operations and maintenance contracted to Delhi Metro Rail Corporation (DMRC).
| Distance / zone | Fare |
|---|---|
| Minimum fare | ₹10 |
| Maximum fare on Line 4 (Poonamallee Bypass to Vadapalani) | ₹40 |
| Poonamallee Bypass to Porur Junction | ₹30 |
| Maximum fare including Phase 1 lines | ₹50 |
Chennai Metro Line 4 (Yellow Line) service timings and frequency:
| Service | Time |
|---|---|
| First train | 07:00 |
| Last train | 21:00 from both terminals |
| Peak frequency (Mon to Sat, 08:00 to 11:00 and 17:00 to 20:00) | Every 10 minutes |
| Off-peak frequency (Mon to Sat) | Every 15 minutes |
| Sundays and holidays | Every 15 minutes, 07:00 to 21:00 |
Line 4, the Yellow Line, runs 26.1 km from Light House near Marina Beach to Poonamallee Bypass. About 16 km is elevated and 10.1 km is underground. Only the Poonamallee Bypass to Vadapalani section is open.
Prime Minister Narendra Modi and Chief Minister C. Joseph Vijay inaugurated it on 11 October 2026. Passenger service began at 4 pm that day, and the regular timetable started on 12 October 2026.
Eleven elevated stations: Poonamallee Bypass, Poonamallee Bus Stand, Poonamallee Government Hospital, Karayanchavadi, Kumananchavadi, Kattupakkam, Iyyappanthangal, Thelliyaragaram, Porur Bypass, Porur Junction and Vadapalani. Six stations between Porur Junction and Vadapalani are still under construction and are skipped.
Trains run from 7 am to 9 pm, with the last train leaving both terminals at 9 pm. From Monday to Saturday trains run every 10 minutes from 8 to 11 am and 5 to 8 pm, and every 15 minutes at other times. On Sundays and holidays they run every 15 minutes.
CMRL's fare table charges ₹40 from Poonamallee Bypass to Vadapalani. Fares on the line range from ₹10 to ₹40, and journeys that continue onto the Blue or Green Line cost up to ₹50.
The new Line 4 Vadapalani station is connected to the existing Phase 1 Vadapalani station by a link bridge. Permanent entry and exit facilities at the Line 4 station are still being built.
The 11.5 km Vadapalani to Light House section, mostly underground, is under construction. CMRL has said Phase 2 is planned for completion by the end of 2028.
No awarded tenders or contracts recorded yet.
| Tender | Agency | Value | Bid due | Status |
|---|---|---|---|---|
| Chennai Water Metro: CMRL floated tender for DPR along Buckingham Canal | CMRL | Open | ||
| Chennai Metro Line 3: PSD Door System Supply | CMRL | Subscribers | Subscribers | Under evaluation |
| Chennai Metro Phase 1 & 2 Expansion: Bids Invited for DPRs’ Preparation | CMRL | Subscribers | Under evaluation |
No upcoming tenders announced yet.
Bid values, closing dates and awardees are for subscribers. See plans.