Bengaluru Metro is an operational metro system in Bengaluru, run by Bangalore Metro Rail Corporation Limited (BMRCL). It covers 96.1 km, with fares from ₹10 to ₹90 and trains operating 05:00 to 23:00 roughly every 3 to 5 minutes. Its route map, stations, fares and timings are below.
Namma Metro is Bengaluru’s rapid transit system, run by the Bangalore Metro Rail Corporation Limited (BMRCL). It was the first metro in South India when it opened in 2011, and it has since become a daily lifeline in a city where road traffic is a constant struggle. The network keeps expanding as Bengaluru grows outward.
The core of the system is the Purple Line running east to west and the Green Line running north to south, crossing at the Nadaprabhu Kempegowda interchange in the city centre. Phase 2 has stretched both lines further into the suburbs, and new corridors are under construction, including the Yellow Line toward Electronics City and the lines that will carry the network to Kempegowda International Airport.
BMRCL builds and runs Namma Metro. Its current work spans Phase 2 extensions and Phase 2A and 2B, which together add the airport link and fresh corridors across the fast-growing outer city. Station openings, rolling-stock deliveries and contract awards arrive regularly as construction continues.
What are the Bengaluru Metro timings?
Bengaluru Metro operates 05:00 to 23:00. Trains run at a frequency of 3 to 5 minutes.
What is Namma Metro?
Namma Metro is the name of Bengaluru’s metro system, run by the Bangalore Metro Rail Corporation Limited (BMRCL).
When did the Bengaluru Metro open?
It opened in 2011 and was the first metro system in South India.
Is Bengaluru Metro reaching the airport?
Yes. Corridors under construction will connect the network to Kempegowda International Airport.
How busy is Namma Metro?
It carries roughly 8.5 lakh passengers a day (2025).
What are Bengaluru Metro fares?
Fares are distance-based, from Rs 10 up to about Rs 90 for the longest trips, with smart-card discounts.
Is there a Bengaluru Metro route map and journey planner?
Yes. This hub has an interactive route map and journey planner, plus the full station list, fares, live tenders and the latest updates.
| Phase | Lines | Stations | Length (km) | Status |
|---|---|---|---|---|
| Purple Line | Challaghatta–Whitefield (Kadugodi) | 37 | 43.49 | Operational |
| Green Line | Madavara–Silk Institute | 32 | 33.46 | Operational |
| Yellow Line | RV Road–Bommasandra | 16 | 19.15 | Operational |
| Pink Line | Kalena Agrahara–Nagawara | 18 | 21.39 | Under Construction |
| Blue Line | Central Silk Board–Airport | 30 | 58.19 | Under Construction |
Latest ridership: ≈8.5 lakh/day (2025)
Bengaluru Metro fares range from ₹10 to ₹90, set by Bangalore Metro Rail Corporation Limited (BMRCL).
| Distance / zone | Fare |
|---|---|
| Minimum fare | ₹10 |
| Maximum fare | ₹90 |
Bengaluru Metro service timings and frequency:
| Service | Time |
|---|---|
| Operating hours | 05:00 to 23:00 |
| Frequency (peak) | 3 to 5 minutes |
| Tender / Contract | Agency | Value | Awarded to |
|---|---|---|---|
| Central Silk Board travellator & walkway | — | ₹55.48 Cr | Milan Road Buildtech LLP |
| DPR: Green Line extension, Madavara (BIEC)-Tumakuru | — | ₹1.2 Cr | Aarvee Engineering Consultants |
| 6 additional driverless trainsets (36 cars), Phase 2 Reach 5 | — | ₹414 Cr | BEML Limited |
| AFC system: Phase 2A & 2B | — | ₹76 Cr | Hitachi Rail GTS India |
No ongoing tenders for this project right now.
No upcoming tenders announced yet.
Bid values, closing dates and awardees are for subscribers. See plans.