BHOPAL (Metro Rail News): Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) has invited e-tenders for the design, supply, installation, testing, and commissioning of Electrical and Mechanical systems, DG Sets, ECS, TVS & BMS/SCADA system across 19 stations of the Bhopal Metro Rail Project under Package BH-14.
The contract, valued at approximately ₹277.8 crore (inclusive of GST), covers 17 elevated stations and 2 underground stations, along with associated tunnel sections, cross passages, and ramps.
Tender Details:
| Parameter | Details |
| Tender Package | BH-14 |
| Issuing Authority | Madhya Pradesh Metro Rail Corporation Limited (MPMRCL) |
| Approximate Cost | ₹277.8 Crore (Incl. GST, Excl. Custom Duties) |
| EMD / Tender Security | ₹2.78 Crore |
| Tender Fee | ₹50,000 (Incl. GST, Non-Refundable) |
| Completion Period | 749 Days / 107 Weeks (Excl. DLP & CAMC) |
| Tender Documents Available | March 28, 2026 – May 19, 2026 |
| Last Date for Queries | April 12, 2026 (by 18:00 hrs) |
| Pre-Bid Meeting | April 17, 2026 (at 15:30 hrs) |
| Last Date for Addendum | May 2, 2026 |
| Tender Submission Window | May 9 – May 19, 2026 |
| Technical Bid Opening | May 20, 2026 (at 16:30 hrs) |
Scope of work: Design Verification, Detail Engineering, Supply, Installation, Testing & Commissioning of Electrical and Mechanical System, DG Sets, ECS, TVS & BMS/SCADA system for 17 Elevated Stations & 02 Under Ground Stations with Ancillary Building and associated Tunnel section, cross passages, ramps and two-years DLP (Defects Liability Period) followed by three-years of CAMC (Comprehensive Annual Maintenance Contract) of Bhopal Metro Rail Project.
Key Dynamics of the Bhopal Metro Project
Phase 1 of Bhopal Metro spans about 30km and features 2 metro lines, including the Orange Line and the Blue Line. In December 2025, the first section of Bhopal Metro Phase 1 became operational from AIIMS to Subhash Nagar. This 7km stretch is part of the Orange Line. The upcoming sections of the project will be opened in a phased manner. Amidst these developments, there is another emerging aspect of Bhopal Metro, which is cost overruns. The Bhopal Metro Phase 1 was initially planned to be built at ₹6,941 crore; the delays have pushed this cost to ₹10,000 crore, which is a major concern for the long term financial sustainability of the project.
Also Read: Indore Metro opens bids for ECS, TVS & BMS systems for 9 UG stations
Also Read: Milestone for Railways: ICF to roll out India’s first Vande Bharat Freight train for RDSO trials
Also Read: Bhopal Metro floats ₹123 Cr tender for escalator & lift procurement
Discover how AI is bringing the next phase of sustainable urban rail mobility for Viksit Bharat at InnoMetro 2026, India’s prime exhibition and conference for metro & railways, which is going to be held on 21-22 May 2026 at Bharat Mandapam, New Delhi.
Register Now: https://zma.page/ek9