Home Latest News NHSCRL invites tender for preparing DPR of high-speed rail corridor

NHSCRL invites tender for preparing DPR of high-speed rail corridor

0
784
NHSCRL invites tender for preparing DPR of high-speed rail corridor
Bullet train/ Representational image

NEW DELHI (Metro Rail News): The National High Speed Rail Corporation Limited (NHSRCL) has invited tenders for the preparation of a detailed project report (DPR) for the 459 km Delhi-Chandigarh-Amritsar high-speed rail corridor. According to NHSRCL, the single-stage two-packet tender has been invited for surveying the route to identify overhead, overground and underground utilities as well as to identify power availability options for the high-speed rail traction supply sub-stations along the route.

The NHSRCL said that a pre-bid meeting is scheduled on October 28, and the starting date for submissions of tender is November 3. The last date for submissions is November 9 and tenders are to be opened on November 10. Besides the Delhi-Chandigarh-Amritsar high-speed corridor, the NHSRCL has been entrusted by the Ministry of Railways to prepare a DPR for six new more high-speed rail corridors, including the 865 km Delhi-Varanasi, 753 km Mumbai-Nagpur, 886 km Delhi-Ahmedabad, 435 km Chennai-Mysore, 711 km Mumbai-Hyderabad and 760 km Varanasi-Howrah corridor.

The NHSRCL is collecting data on these new proposed corridors for the preparation of the DPRs. It is currently constructing the 508 km Mumbai-Ahmedabad high-speed rail project, popularly known as the Bullet Train Project. On Monday, the NHSRCL had said that Larsen and Toubro (L&T) has emerged as the lowest bidder for constructing the 237 km length of the Bullet Train Project under the Mumbai-Ahmedabad high-speed rail corridor.

Guide

High-Speed Rail in India: the complete guide

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here