Home Latest News National Pics | Cutter head of Godavari -1 lowered at Vidya Nagari in Mumbai Metro 3 Project

Pics | Cutter head of Godavari -1 lowered at Vidya Nagari in Mumbai Metro 3 Project

0
787
Pics | Cutter head of Godavari -1 lowered at Vidya Nagari in Mumbai Metro 3 Project
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3

Today cutter head of #Godavari-1 TBM lowered at Vidya Nagari launching shaft. It will soon start tunneling for 2.9 km stretch between Vidya Nagari and CISA Domestic Airport.

Here are some photographs taken from the construction site:

Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3

Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3

Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3
Lowering of TBM Cutter Head at Vidya Nagari site of Mumbai Metro 3

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here