Mumbai metro to suffer a loss of Rs Rs 200 crores due to the controversial car shed shifting from Aarey Colony
MUMBAI (Metro Rail News): After a long controversy and politics on the Aarey car shed matter, now the Mumbai Metro Rail Corporation (MMRCL) will...
Mumbai Metro 3 corridor achieve Second TBM breakthrough at SEEPZ station
Mumbai. Metro Rail News:The Mumbai Metro Rail Corporation (MMRC) today achieve the breakthrough of the second TBM of Colaba-Bandra-SEEPZ Metro-3 corridor at SEEPZ station. The first...
Mumbai Metro | MMRC completes 15% construction work in Colaba-Bandra-SEEPZ corridor
Mumbai: The Mumbai Metro Rail Corporation (MMRC) has completed approximately 15-16 percent of the civil construction for 33.5km of the 33-tunnel underground corridor. Work...
Mumbai Metro 3 | Residents take MMRC to Bombay High court
Mumbai: A Cuffe Parade resident has moved the Bombay High Court against the Mumbai Metro Rail Corporation (MMRC) in connection with the construction of...
Mumbai Metro | Mumbai’s Colaba-Bandra-SEEPZ Metro-3 to be ready by 2021
Mumbai: The Mumbai Metro Rail Corporation (MMRC) is likely complete the Metro-3 corridor (Colaba-Bandra-SEEPZ) by December 2021 instead of early 2021. It has also...
Mumbai Metro | MMRC appoints architects for Kalbadevi-Girgaum rehabilitation
Mumbai: The Mumbai Metro Rail Corporation (MMRC) has appointed GD Sambhare & RH Mahimatura Architects to provide Architectural, Design and PMC services for Kalbadevi-Girgaum in-situ rehabilitation...




