This article has not been translated yet, so the English original is shown below. Translate now (takes a few seconds).
MUMBAI (Metro Rail News): The Mumbai Metropolitan Region Development Authority (MMRDA) is considering to appoint M/s AFCONS Infrastructure Ltd to partly design and construct the elevated viaduct – including the integration with Metro-4 (Wadala to Kasarvadavali) and Metro-5 (Thane-Bhiwandi-Kalyan).
Besides, the construction of seven elevated stations, namely Dhamankar Naka, Anjur Phata, Purna, Kalher, Kasheli, Balkum Naka and Kapurbawdi on the Metro-5 corridor is being considered. In Tuesday’s executive committee meeting, the proposal was tabled by MMRDA.
The committee appointed the consortium of M/s. Systra (France), M/s. Consulting Engineers Group Ltd and M/s Systra MVA Consulting (India) Pvt Ltd as general consultants for the construction of civil work on Metro-5 and Metro-9 (Dahisar East to Mira-Bhayandar) and (Andheri East to CSMIA) corridors.
Get the Daily Metro & Rail Brief
Join 125,000+ metro and rail professionals. Project updates, new tenders and contract awards from across India, in your inbox every day.
Moreover, for the Metro Bhavan and the operation control center in Aarey, M/s Epicons Consultant Pvt Ltd has been appointed as the project management consultants.
“Considering the traffic chaos and low air quality, what we need is total connectivity. Hence our focus is to develop all the metro lines,” said RA Rajeev, Commissioner, MMRDA.
Project OverviewMumbai Metro – Information, Route Map, Fares, Tenders & Updates
Read nextMumbai Metro 2B: MMRDA Races to Install Final Three Girders at Juhu Circle for Andheri West-Saraswat Nagar Stretch16 Nov 2026Get alerts for big metro and rail stories Openings, trials, fares and approvals. Two or three a day at most; turn them off any time.




