High Speed Rail Projects

Guide

High-Speed Rail in India: the complete guide

All corridors, status, routes and the latest news in one place →

About High Speed Rail Projects

All the Updated information, fare, route maps, tender and construction updates of all high-speed rail (Bullet train) projects (HSR) in India

High Speed Rail Projects — Frequently Asked Questions

What is the status of the Mumbai–Ahmedabad bullet train?

The 508.17 km Mumbai–Ahmedabad High Speed Rail corridor is under construction by NHSRCL using Japanese Shinkansen technology, with the Gujarat section targeted to open first. It is India's first high-speed rail line.

Which other bullet train corridors are proposed in India?

Seven corridors have been studied under the National Rail Plan, including Delhi–Varanasi (865 km), Delhi–Ahmedabad (886 km), Mumbai–Nagpur (741 km), Mumbai–Hyderabad (767 km) and Chennai–Bengaluru–Mysuru (463 km).

What speed will Indian bullet trains run at?

The Mumbai–Ahmedabad corridor is designed for 320 km/h operations using Shinkansen technology, cutting the Mumbai–Ahmedabad journey to about two hours.

spot_img

1st Pile Cap Erected for the Sabarmati Bridge on the Mumbai – Ahmedabad Bullet Train Project 

AHMEDABAD (Metro Rail News): Marking a positive development in the Mumbai-Ahmedabad Bullet Train Project, NHSRCL erected the first pile cap on the Sabarmati River...

Dineshchandra-DMRC JV Bags Mumbai-Ahmedabad Bullet Train’s Thane Depot Contract

THANE(Metro Rail News): NHSRCL has issued a Letter of Acceptance for ‘Design and Construction of Thane Rolling Stock Depot’ in the state of Maharashtra...

L&T & Sojitz Consortium Bags Mumbai-Ahmedabad Bullet Train Project’s Electrification Contract

AHMEDABAD (Metro Rail News): National High-Speed Rail Corporation Limited (NHSRCL) has awarded the L&T-Sojitz Consortium with a contract to facilitate a 2 x 25...

100 % Land Acquisition Achieved in Mumbai-Ahmedabad Bullet Train Project 

MUMBAI (Metro Rail News): Per the tweet of the railway's minister, the ambitious Mumbai-Ahmedabad Bullet Train project has achieved 100% land acquisition across Gujarat,...

Pramod Sharma Takes Charge as Director (Works) at NHSRCL

DELHI (Metro Rail News): In a significant development, Shri Pramod Sharma, a distinguished officer of the Indian Railway Service of Engineers (IRSE) 1989 batch,...

DRA-DMRC JV Bags Mumbai Ahmedabad Bullet Train’s Thane Depot Contract 

MUMBAI (Metro Rail News): Dineshchandra R Agrawal Infracon – Delhi Metro Rail Corporation (DRA – DMRC JV) was declared as the lowest bidder for...
spot_img