
BENGALURU (Metro Rail News): Bengaluru Integrated Rail Infrastructure Development Enterprise Limited (Bi-RIDE) has invited international bids worth ₹1,017.19 crore, excluding GST and customs duty, to equip Corridors 2 and 4 of the Bengaluru Suburban Transport Project (BSTP) with a 5G-based European Train Control System (ETCS) Level 2 hybrid signalling and telecommunication system.
The package covers design, manufacture, supply, installation, testing and commissioning on a design-build basis. Funded by KfW, the contract sets completion periods of 21 months for Corridor 2 and 30 months for Corridor 4 from the letter of acceptance, each followed by a 24-month defect liability period.
Continue reading this tender report
Full tender news is for subscribers. Start a 15-day free trial to read the rest. No card needed, and it does not auto-charge.
Already subscribe? Sign in · See all plans
Read nextNCRTC Awards ₹60.23 Cr Contract to Shift HVPNL Transmission Lines on Delhi-Panipat-Karnal Namo Bharat Corridor11 Nov 2026



