
DELHI (Metro Rail News): The Delhi Metro Rail Corporation (DMRC) has invited bids for the design and construction of a new passenger connection. This connection will link the underground Azadpur Metro Station on Line 7 (Pink Line) with the elevated Azadpur Metro Station on the Line 8 Extension. The estimated cost for this project is Rs 7.54 crore. It aims to improve passenger movement at one of Delhi Metro’s busiest interchange stations.
Tender details
| Information | Details |
| Tender Number | CPM-2/2026-27/D-22 |
| Estimated Cost | Rs 7.54 crore (inclusive of all taxes) |
| Tender Security | Rs 7.54 lakh |
| Completion Period | 5 months |
| Pre-bid Meeting | 4 August 2026 at 11:30 AM |
| Tender Submission Deadline | 14 August 2026, 9:00 AM to 22 August 2026, 3:00 PM |
Scope of work
The work includes design and construction of connection between underground Azadpur Station (Entry/Exit) of line-7 with Elevated Azadpur Metro Station of Line-8 extension.
The weekly brief metro & rail professionals read.
About the project
Azadpur is one of the most important interchange stations in the Delhi Metro network. It currently connects the underground Pink Line (Line 7) with the Yellow Line. Under Delhi Metro Phase IV, the Line 8 Extension (Magenta Line Extension) will also reach Azadpur, turning it into a triple-interchange station.
The Pink Line station operates underground with dedicated entry and exit points. The upcoming elevated station on the Line 8 Extension will be part of the expanding Phase IV network. The new connection will make transfers between these metro lines faster and more convenient, enhancing Azadpur’s role as a major multi-modal transport hub in Delhi.
Also Read: Titagarh & RKFL’s railway wheelset plant to begin production in August
Guide