Home Metro Rail Projects Delhi Metro DMRC Floats tender for Civil work contract of Inderlok to Indraprastha Corridor 

DMRC Floats tender for Civil work contract of Inderlok to Indraprastha Corridor 

DMRC Floats tender for Civil work contract of Inderlok to Indraprastha Corridor 
Delhi Metro/Representational Image

Delhi ( Metro Rail News): Delhi Metro Rail Corporation (DMRC) has invited tender for the civil work contract  D2C-01 of Delhi Metro Phase 4’s Inderlok to Indraprastha corridor. 

Tender Details 

Opening Date7 Apr 2025
Closing Date19 May 2025
Tender Id2025_DMRC_855903_1
Approximate cost of workRs. 117.16 Crores 
Contract Duration 32 Months 
Pre-bid Meeting17.04.2025
EMD₹ 58,58,000

DMRC Brief Scope: Design and Construction of elevated viaduct, ramp from chainage CH: – 514.012 to CH: 440.000 and one elevated station i.e. Inderlok including Architectural finishing, plumbing and Pre-engineered steel roof structure & roof sheeting works (including Entry/Exit structure at station) of Inderlok to Indraprastha corridor of Delhi MRTS Phase-IV project.

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here