Home Metro Rail Projects Pune Metro RVNL Bags Contract for the Construction of Pune Metro’s Nigdi Extension Stretch

RVNL Bags Contract for the Construction of Pune Metro’s Nigdi Extension Stretch

2 min read
0
1,789
RVNL Bags Contract for the Construction of Pune Metro’s Nigdi Extension Stretch
Pune metro
Listen to this story
0:00

PUNE (Metro Rail News): Pune Metro has declared Rail Vikas Nigam Limited (RVNL) the lowest bidder for constructing a 4.519 km new viaduct to extend its Purple Line. 

Extension 

The extension aims to connect Pune metro’s Pimpri Chinchwad Municipal Corporation (PCMC) metro station to the Nigdi (Bhakti Shakti) metro station. 

Get the Daily Metro & Rail Brief

Join 125,000+ metro and rail professionals. Project updates, new tenders and contract awards from across India, in your inbox every day.

Free · One email a day · Unsubscribe anytime · We never share your address

Scope of the Contract

The scope of the contract entails the Designing and Construction of an Elevated Viaduct of Length 4.519 Kms between PCMC and NIGDI (Bhakti Shakti) on the North-South Corridor of Pune Metro Rail Project- Reach1 – Extension. 

SponsoredInnoBus Conference & Expo 2026, 23 December 2026, Bharat Mandapam, New Delhi

The Metro Stations

The construction of elevated stations at Chinchwad, Akurdi, and Nigdi along the route will be undertaken through a distinct package, with a tender notice currently awaiting issuance.

RVNL’s Bid: Rs. 339 crore

Approval 

The Ministry of Housing & Urban Affairs approved the 4.413 Km extension of the Pune metro’s Purple line at an estimated cost of Rs 910.18 Crore. The line is proposed to be extended from Pimpri Chinchwad Municipal Corporation (PCMC) to Nigdi. 

Pune Metro

The proposed expansion will add 4.413 Km to the Pune metro, which already exists at 54.14 Km, divided into three lines, of which 27.15 km is operational.


Discover the endless possibilities of our city’s Metro at InnoMetro, our flagship Expo and Conference. Be an active participant in shaping its future towards a more sustainable tomorrow. Stay informed and join us to take a step towards a brighter future. 

Pune Metro Line 3 1Read nextPune Metro Pink Line: 2 Baner Stations May Open in December After Safety Inspection19 Nov 2026

Add to Preferred Sources

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here