Home Latest News MMRDA plans to combine flyover and Metro line expansion for better connectivity

MMRDA plans to combine flyover and Metro line expansion for better connectivity

MMRDA plans to combine flyover and Metro line expansion for better connectivity
MMRDA may need to demolish and rebuild nearly 1 km of Metro Line 7A's viaduct after a height clearance mismatch with AAI norms,(Representational Image)

MUMBAI (Metro Rail News): MMRDA (Mumbai Metropolitan Region Development Authority) is likely to build a combined 2.58 Km road flyover below Metro line 6 ( Swami Samarth Nagar-Vikhroli) to provide additional transport facilities.

The elevated Mumbai Metro 6 runs through Jogeshwari, WEH, and Powai, comprising a 15.31 km elevated corridor which will form a vast metro network connecting four other metro corridors – Metro line 2A, Metro 3 Cola Bandra SEEPZ, Metro 4, and Metro 7.

As per MMRD, Metro 6 will have 13 stations, and 66 % work has been completed. In addition, the civil work on metro stations on line 6 is 51.50 per cent complete.

According to SVR Srinivas, MMRDA Commissioner, the Mumbai Metro Network is being constructed by the authority to provide rapid transportation services to people within a short travel distance. Metro line 6 will offer rail-based connectivity between Western and Eastern suburbs and play an essential role in an integrated public transport network for people.

Project Overview

Mumbai Metro – Information, Route Map, Fares, Tenders & Updates

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here