Home Metro Rail Projects Chennai Metro 26 driverless trains will be produced by Alstom for Chennai Metro Rail

26 driverless trains will be produced by Alstom for Chennai Metro Rail

1 min read
0
1,129
26 driverless trains will be produced by Alstom for Chennai Metro Rail
Representational image
Listen to this story
0:00

CHENNAI (Metro Rail News): Alstom Transport India Limited has been given a contract by Chennai Metro Rail Limited (CMRL) to build 26 three-car driverless trains at a cost of Rs 947 crore. These trains will run along metro corridors in phase two.

2024 will be the deadline for Alstom to deploy the first driverless train. They also built all the other 52 trains for CMRL in phase 1. The remaining trains will be delivered throughout the following year. The project will take around 40 months to complete.

The delivery of driverless trains (UTO- Unattended Train operation) is covered by the contract, which also covers the design, production, testing, and commissioning of standard gauge metro rolling stock, as well as the training of people, the provision of spare parts, and defect liability.

28fc6899 5762 4e3b 84d7 90812504340bRead nextChennai Metro Completes 413m Kathipara Viaduct; 6 Trains to Run Simultaneously by March 2027 27 Nov 2026

Add to Preferred Sources

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here