Home Latest News Three Firms Participate in the Bid for Roof-Work of Delhi – Meerut RRTS Under Package 12B

Three Firms Participate in the Bid for Roof-Work of Delhi – Meerut RRTS Under Package 12B

0
458

NEW DELHI (Metro Rail News): National Capital Region Transport Corporation (NCRTC) recently opened technical bids for the 82.15 km Delhi – Meerut RRTS Line‘s Package 12B which revealed that three firms have submitted bids to design, supply and erect pre-engineered steel roof structures at 12 elevated stations.
NCRTC had invited bids for this work in 2 lots in September right after Sam India Builtwell emerged as the lowest bidder for Package 12A for similar roof-work at Package 1 and 2’s Sahibabad, Ghaziabad, Guldhar and Duhai stations.
For Package 12B, 7 of these 12 stations form a part of the 33 km Package 3 (under construction by Larsen & Toubro) – the ones at Murad Nagar, Modi Nagar South, Modi Nagar North, Meerut South, Partapur, Rithani & Shatabdi Nagar.
NCRTC’s combined estimate is $8.71 million (Rs 63.79 crore) and it expect the assigned contractor(s) to complete all civil work in 1358 days.
Bidders:
Galadari Engineering Works Ltd.

Pioneer Fabricators Pvt. Ltd.

URC Construction Pvt. Ltd.

Lot-1: DM/CN/COR-OF/119

The weekly brief metro & rail professionals read.

One email a week. We never share your address. Unsubscribe anytime.

Lot-P12B L1: – Design, Fabrication, Supply and Erection of Pre–Engineered Steel Roof Structure of 6 (Six) Elevated stations viz Murad Nagar, Modi Nagar South, Modi Nagar North, Meerut South, MES Colony and Daurli Stations of Delhi – Ghaziabad –Meerut RRTS Corridor.

Lot-2: DM/CN/COR-OF/120

Lot-P12B L2: – Design, Fabrication, Supply and Erection of Pre–Engineered Steel Roof Structure for 6 (Six) Elevated stations viz Partapur, Rithani, Shatabdi Nagar, Brahmpuri, Meerut North and Modipuram of Delhi – Ghaziabad – Meerut RRTS Corridor.

Guide

Namo Bharat & RRTS: the complete guide

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here