
MUMBAI (Metro Rail News): With few recent developments, it can easily be seen that the Uddhav Thackeray-led Maharashtra government is keen on shifting the Metro 3 car shed out of Aarey forests. The workS for removing construction materials from the site has already begun which gives a clear signal about the move.
”The car shed site is being closed and secured”, Mumbai Metro Rail Corporation (MMRC) project director SK Gupta was stated saying by a media agency. He further said that the construction debris was being cleared out and pits were being filled so that they did not remain a safety hazard.
Soon after being sworn in as chief minister, Thackeray announced a stay on construction of metro carshed in the area. The matter is politically sensitive and no one wants to comment on this as of now. The move will cost a huge loss to the MMRC according to experts.
Read nextMumbai Metro Line 11 Gets Major Push as MMRC Surveys 800 Structures24 Nov 2026Get alerts for big metro and rail stories Openings, trials, fares and approvals. Two or three a day at most; turn them off any time.




