Home Latest News Aarey project to be shifted!

Aarey project to be shifted!

1 min read
0
756
Aarey project to be shifted!
Aarey Car shed
Listen to this story
0:00

MUMBAI (Metro Rail News): With few recent developments, it can easily be seen that the Uddhav Thackeray-led Maharashtra government is keen on shifting the Metro 3 car shed out of Aarey forests. The workS for removing construction materials from the site has already begun which gives a clear signal about the move.

”The car shed site is being closed and secured”, Mumbai Metro Rail Corporation (MMRC) project director SK Gupta was stated saying by a media agency. He further said that the construction debris was being cleared out and pits were being filled so that they did not remain a safety hazard.

Soon after being sworn in as chief minister, Thackeray announced a stay on construction of metro carshed in the area. The matter is politically sensitive and no one wants to comment on this as of now. The move will cost a huge loss to the MMRC according to experts.

mumbai metro line 2a 7 train depotRead nextMumbai Metro Line 11 Gets Major Push as MMRC Surveys 800 Structures24 Nov 2026

Add to Preferred Sources

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here