Home Latest News Versova-Andheri-Ghatkopar line one Metro waiting for green signal from state for restart

Versova-Andheri-Ghatkopar line one Metro waiting for green signal from state for restart

0
707
Versova-Andheri-Ghatkopar line one Metro waiting for green signal from state for restart

Mumbai ( Metro Rail News ) – The Versova-Andheri-Ghatkopar Line One Mumbai Metro team on Sunday said they were waiting for directives from the Maharashtra government, following a statement by the Union Ministry of Home Affairs, that the Metro railways will be allowed to operate in a graded manner by the respective state ministries and departments.

In an announcement made on Saturday as part of Unlock 4.0 guidelines, the Ministry of Home Affairs (MHA) has granted permission for the Metro rail to resume services from September 7 in a graded manner. “Further, guidelines and Standard Operating Procedures (SOP) will be issued by officials and will have to be followed strictly by the respective states,” it said.

Since the lockdown came into effect, the Mumbai Metro team has been working on keeping its trains ready and updated. In fact, in one of their social media posts in May 2020, the team had shared basic details on how they had been working on alternative seating arrangements to ensure safe distance while travelling.

“The Metro technical teams have been on the job and were conducting test runs, and health checks of the entire Metro system like tracks, signalling, trains, communication, including carrying out daily maintenance of the tracks on the main line and depot line to ensure its health and stability. With regular maintenance activities on all our trains, we are fully prepared,” a Metro official was stated saying.

Over five years after it began operations in June 2014, Metro One (Versova-Andheri-Ghatkopar) in 2019 crossed the 60-crore ridership landmark with a daily average ridership exceeding 4.5 lakh.

Guide

Mumbai Metro: the complete guide

All corridors, status, routes and the latest news in one place →

Join the Discussion

Have a correction, an on-the-ground update, or a question about this project? Engineers, operators and consultants across the metro, rail and RRTS sector read these threads.

Every comment is read by our editorial team before it appears.

Please enter your comment!
Please enter your name here