As of 19 Oct 2026, Chennai Metro Line 5 (Red Line) is under construction. Latest news: 15 Oct 2026.
Chennai Metro Line 5, the Red Line, is Corridor 5 of CMRL's Phase II: a 47 km line from Madhavaram Milk Colony to Sholinganallur via Villivakkam, Koyambedu, Valasaravakkam, Alandur and Medavakkam. It has 45 stations, with 41.2 km elevated and 5.8 km underground. As of October 2026 no section is open; trial runs on the Koyambedu to Chennai Trade Centre stretch are targeted for November 2026.
Line 5 is the longest of the three Phase II corridors and the only one that runs as an outer north to south arc, linking north Chennai and the Koyambedu bus hub with Alandur, St. Thomas Mount and the Medavakkam to Sholinganallur belt without passing through the city centre. It connects with both Phase I lines, the suburban rail network and the MRTS, and shares a double-decker viaduct with Line 4 between Alwarthirunagar and Alapakkam.
The 45 stations below run from Madhavaram Milk Colony to Sholinganallur. Interchanges are listed where a station connects with another line or a railway station.
| # | Station | Connects to |
|---|---|---|
| 1 | Madhavaram Milk Colony | Line 3 (Purple), shared station |
| 2 | Madhavaram Depot | |
| 3 | Assisi Nagar | |
| 4 | Manjambakkam | |
| 5 | Velmurugan Nagar | |
| 6 | Madhavaram Bus Terminus | Madhavaram mofussil bus terminus |
| 7 | Shastri Nagar | |
| 8 | Retteri Junction | |
| 9 | Kolathur Junction | |
| 10 | Srinivasa Nagar | |
| 11 | Villivakkam | Villivakkam railway station (suburban) |
| 12 | Villivakkam Bus Terminus | |
| 13 | Villivakkam MTH Road | |
| 14 | Anna Nagar West | |
| 15 | Thirumangalam Junction | Line 2 (Green) |
| 16 | Anna Nagar KV | |
| 17 | Koyambedu | Line 2 (Green) |
| 18 | Koyambedu Market | |
| 19 | Natesan Nagar | |
| 20 | Virugambakkam | |
| 21 | Alwarthirunagar | Line 4 (Yellow), shared double-decker station |
| 22 | Valasaravakkam | Line 4 (Yellow), shared double-decker station |
| 23 | Karambakkam | Line 4 (Yellow), shared double-decker station |
| 24 | Alapakkam | Line 4 (Yellow), shared double-decker station |
| 25 | Mugalivakkam | |
| 26 | Ramapuram | |
| 27 | Manapakkam | |
| 28 | Chennai Trade Centre | |
| 29 | Butt Road | |
| 30 | Alandur (Arignar Anna Alandur) | Line 1 (Blue) / Line 2 (Green) |
| 31 | St. Thomas Mount | Line 2 (Green) / suburban railway / MRTS |
| 32 | Adambakkam | MRTS |
| 33 | Vanuvampet | |
| 34 | Ullagaram | |
| 35 | Madipakkam | |
| 36 | Kilkattalai | |
| 37 | Echangadu | |
| 38 | Kovilambakkam | |
| 39 | Vellakkal | |
| 40 | Medavakkam I | |
| 41 | Medavakkam II | |
| 42 | Perumbakkam | |
| 43 | Classical Tamil Institute | |
| 44 | ELCOT Park | |
| 45 | Sholinganallur | Line 3 (Purple), shared station |
| Section | Stations | km | Status | Opened or expected |
|---|---|---|---|---|
| Koyambedu to Chennai Trade Centre (Nandambakkam) | 12 | 12 | Civil and track work largely complete (about 90% of track laid, Sept 2026); traction and signalling tests pending; trial runs targeted for November 2026 | expected early 2027 (after about four months of trials) |
| Chennai Trade Centre (Nandambakkam) to Alandur | 2 | 3.6 | Under construction along Butt Road; CMRL plans to run the first Line 5 services up to Alandur | expected Q1 2027 |
| Alandur to Sholinganallur | 15 | Under construction; piers and all precast elements of the Ullagaram to Sholinganallur package complete (Aug to Oct 2026), girder erection and station works continuing | expected 2027 to 2028 | |
| Madhavaram Milk Colony to Koyambedu | 16 | Under construction, includes the 5.8 km underground stretch from Kolathur to Villivakkam MTH Road (tunnelling by TBM since February 2025) | expected by end-2028 |
Official source: chennaimetrorail.org/phase-2
| Phase | Lines | Stations | Length (km) | Status |
|---|---|---|---|---|
| Koyambedu to Chennai Trade Centre (Nandambakkam) | Koyambedu to Chennai Trade Centre (Nandambakkam) | 12 | 12 | Civil and track work largely complete (about 90% of track laid, Sept 2026); traction and signalling tests pending; trial runs targeted for November 2026 |
| Chennai Trade Centre (Nandambakkam) to Alandur | Chennai Trade Centre (Nandambakkam) to Alandur | 2 | 3.6 | Under construction along Butt Road; CMRL plans to run the first Line 5 services up to Alandur |
| Alandur to Sholinganallur | Alandur to Sholinganallur | 15 | Under construction; piers and all precast elements of the Ullagaram to Sholinganallur package complete (Aug to Oct 2026), girder erection and station works continuing | |
| Madhavaram Milk Colony to Koyambedu | Madhavaram Milk Colony to Koyambedu | 16 | Under construction, includes the 5.8 km underground stretch from Kolathur to Villivakkam MTH Road (tunnelling by TBM since February 2025) |
No. As of October 2026 no part of Line 5 carries passengers. CMRL is targeting trial runs on the Koyambedu to Chennai Trade Centre stretch from November 2026.
Line 5 runs from Madhavaram Milk Colony in north Chennai to Sholinganallur on the OMR, via Kolathur, Villivakkam, Anna Nagar, Koyambedu, Valasaravakkam, Alandur, St. Thomas Mount and Medavakkam.
CMRL gives the length as 47 km, of which 41.2 km is elevated and 5.8 km underground. CMRL's station list has 45 stations, six of them underground.
Trials on the Koyambedu to Chennai Trade Centre section are expected to last about four months, and CMRL plans to start services up to Alandur, so the first opening is likely in early 2027. No date has been announced.
Planned interchanges include Thirumangalam and Koyambedu (Line 2), Alandur (Lines 1 and 2), St. Thomas Mount (Line 2, suburban rail and MRTS), Madhavaram Milk Colony and Sholinganallur (Line 3), and four double-decker stations shared with Line 4.
CMRL owns the line. Operations and maintenance of all three Phase II corridors have been contracted to Delhi Metro Rail Corporation, and the trains are three-car sets from BEML built for driverless operation.
No awarded tenders or contracts recorded yet.
| Tender | Agency | Value | Bid due | Status |
|---|---|---|---|---|
| Chennai Water Metro: CMRL floated tender for DPR along Buckingham Canal | CMRL | Open | ||
| Chennai Metro Line 3: PSD Door System Supply | CMRL | Subscribers | Subscribers | Under evaluation |
| Chennai Metro Phase 1 & 2 Expansion: Bids Invited for DPRs’ Preparation | CMRL | Subscribers | Under evaluation |
No upcoming tenders announced yet.
Bid values, closing dates and awardees are for subscribers. See plans.