Bengaluru Metro Green Line

Operational Operator: Bangalore Metro Rail Corporation Limited (BMRCL) Length: 33.46 km Since: 01/03/2014 Updated: Official site ↗

As of 19 Oct 2026, Bengaluru Metro Green Line is operational (since 1 Mar 2014). Latest news: 4 Nov 2026.

The Bengaluru Metro Green Line is Namma Metro's north-south corridor, running 33.46 km from Madavara in the north-west to Silk Institute on Kanakapura Road through 32 stations, three of them underground around Majestic. Operated by BMRCL, it opened in stages from March 2014 and has run end to end since November 2024. Fares range from ₹10 to ₹90, with trains from 05:00 to 23:00.

Why it matters

The Green Line links the Peenya and Tumakuru Road industrial belt with the city centre at Majestic, where it meets the Purple Line, KSR Bengaluru railway station and the main bus terminal, and with southern residential areas such as Jayanagar, Banashankari and JP Nagar. It also meets the Yellow Line at RV Road. New trains being inducted from 2026 should ease peak crowding, and Phase 3 Orange Line interchanges are planned at Peenya and JP Nagar.

Key facts

  • Operator: Bangalore Metro Rail Corporation Limited (BMRCL)
  • Length: 33.46 km, 32 stations
  • Status (October 2026): Fully operational between Madavara and Silk Institute since 7 November 2024, when the Nagasandra to Madavara extension opened. Services run with 17 BEML six-car trains; the first of 21 new CRRC-Titagarh six-car trains (TS16) entered passenger service in mid-September 2026, with the rest due by the second quarter of 2027. A 59.6 km extension from Madavara to Tumakuru is at the DPR stage and not yet sanctioned.
  • Trains: BEML (with Hyundai Rotem) six-car trains, 17 sets on the line; 21 new CRRC-Titagarh six-car DTG trains being inducted from September 2026, with the BEML sets moving to the Purple Line
  • Ridership: About 2.85 lakh passengers on 17 April 2025 (BMRCL figures reported by Deccan Herald)

Bengaluru Metro Green Line stations

The 32 stations below run from Madavara to Silk Institute. Interchanges are listed where a station connects with another line or a railway station.

#StationTypeConnects to
1MadavaraElevated
2ChikkabidarakalluElevated
3Manjunath NagarElevated
4NagasandraElevated
5DasarahalliElevated
6JalahalliElevated
7Peenya IndustryElevated
8PeenyaElevatedOrange Line (Phase 3, approved)
9GoraguntepalyaElevated
10YeshwanthpurElevatedYesvantpur Junction railway station
11Sandal Soap FactoryElevated
12MahalakshmiElevated
13RajajinagarElevated
14Mahakavi Kuvempu RoadElevated
15SrirampuraElevated
16Mantri Square Sampige RoadElevated
17Nadaprabhu Kempegowda Station, MajesticUndergroundPurple Line / KSR Bengaluru railway station / Kempegowda Bus Station
18ChickpeteUnderground
19Krishna Rajendra MarketUnderground
20National CollegeElevated
21LalbaghElevated
22South End CircleElevated
23JayanagarElevated
24Rashtreeya Vidyalaya RoadElevatedYellow Line
25BanashankariElevated
26Jaya Prakash NagarElevatedOrange Line (Phase 3, approved)
27YelachenahalliElevated
28Konanakunte CrossElevated
29DoddakallasandraElevated
30VajarahalliElevated
31ThalaghattapuraElevated
32Silk InstituteElevated

Sections and opening dates

SectionStationskmStatusOpened or expected
Mantri Square Sampige Road to Peenya Industry109.9Operational (Phase 1, Reach 3 and 3A)2014-03-01
Peenya Industry to Nagasandra32.5Operational (Phase 1, Reach 3B)2015-05-01
Mantri Square Sampige Road to Yelachenahalli1112Operational (Phase 1, underground UG2 plus Reach 4 and 4A)2017-06-18
Yelachenahalli to Silk Institute56.29Operational (Phase 2, Reach 4B)2021-01-15
Nagasandra to Madavara33.14Operational (Phase 2, Reach 3C)2024-11-07
Madavara to Tumakuru59.6Proposed: DPR by Aarvee Engineering Consultants submitted to the state in 2026, PPP (BOT) model suggested, awaiting state cabinet decision; not sanctionednot scheduled

Explore more

Official source: english.bmrc.co.in

Latest updates

34 tenders tracked →

See all news & updates →

Phases

PhaseLinesStationsLength (km)Status
Mantri Square Sampige Road to Peenya IndustryMantri Square Sampige Road to Peenya Industry109.9Operational (Phase 1, Reach 3 and 3A)
Peenya Industry to NagasandraPeenya Industry to Nagasandra32.5Operational (Phase 1, Reach 3B)
Mantri Square Sampige Road to YelachenahalliMantri Square Sampige Road to Yelachenahalli1112Operational (Phase 1, underground UG2 plus Reach 4 and 4A)
Yelachenahalli to Silk InstituteYelachenahalli to Silk Institute56.29Operational (Phase 2, Reach 4B)
Nagasandra to MadavaraNagasandra to Madavara33.14Operational (Phase 2, Reach 3C)
Madavara to TumakuruMadavara to Tumakuru59.6Proposed: DPR by Aarvee Engineering Consultants submitted to the state in 2026, PPP (BOT) model suggested, awaiting state cabinet decision; not sanctioned

Latest ridership: About 2.85 lakh passengers on 17 April 2025 (BMRCL figures reported by Deccan Herald)

Milestones

  • Union government sanctions Namma Metro Phase 1, including the North-South corridor
  • Union government approves Namma Metro Phase 2, including the Yelachenahalli to Anjanapura (Silk Institute) and Nagasandra to BIEC (Madavara) extensions
  • First section, Sampige Road to Peenya Industry, opens to passengers
  • Peenya Industry to Nagasandra section opens
  • President Pranab Mukherjee inaugurates the underground section and the southern stretch to Yelachenahalli, completing Phase 1
  • Passenger services begin along the full Nagasandra to Yelachenahalli route
  • First six-car train enters service on the line
  • Yelachenahalli to Silk Institute (Reach 4B), the first Phase 2 section, opens to passengers
  • Trial runs begin on the Nagasandra to Madavara extension
  • CMRS completes inspection of the Nagasandra to Madavara extension
  • Nagasandra to Madavara extension (3 stations) opens, completing the 32-station line
  • BMRCL invites bids for the DPR of the Madavara to Tumakuru extension
  • Aarvee Engineering Consultants awarded the Madavara to Tumakuru DPR contract
  • Madavara to Tumakuru DPR submitted to the Karnataka government, PPP model suggested
  • First CRRC-Titagarh six-car train (TS16) enters passenger service on the line

Fares

Bengaluru Metro Green Line fares range from ₹10 to ₹90, set by Bangalore Metro Rail Corporation Limited (BMRCL).

Distance / zoneFare
Minimum fare (up to 2 km)₹10
Maximum fare (network, longest distance slab)₹90

Timings

Bengaluru Metro Green Line service timings and frequency:

ServiceTime
First train from terminals, Monday to Saturday05:00
First train, Sunday07:00
Last train from terminals23:00

Frequently asked questions

How long is the Bengaluru Metro Green Line?

The Green Line is 33.46 km long, running from Madavara to Silk Institute with 32 stations. 29 stations are elevated and three are underground.

Where can I change from the Green Line to other metro lines?

Interchange with the Purple Line is at Nadaprabhu Kempegowda Station, Majestic, and with the Yellow Line at Rashtreeya Vidyalaya Road. Orange Line interchanges are planned at Peenya and Jaya Prakash Nagar under Phase 3.

When did the Green Line open?

The first section, Sampige Road to Peenya Industry, opened on 1 March 2014. The line reached Silk Institute in January 2021 and Madavara on 7 November 2024.

What is the fare on the Green Line?

Fares start at ₹10 for short trips and go up to ₹90 for the longest distance slab under the February 2025 fare revision.

What are the Green Line timings?

Trains start from the terminals at 05:00 from Monday to Saturday and at 07:00 on Sunday, and the last trains leave the terminals at 23:00.

Is the Green Line being extended to Tumakuru?

A 59.6 km extension from Madavara to Tumakuru is under study. Its DPR was submitted to the Karnataka government in 2026, but the project has not been sanctioned.

Is the Green Line getting new trains?

Yes. BMRCL is inducting 21 six-car CRRC-Titagarh trains on the Green Line; the first entered service in September 2026 and the rest are due by the second quarter of 2027.