High Speed Rail Projects

Guide

High-Speed Rail in India: the complete guide

All corridors, status, routes and the latest news in one place →

About High Speed Rail Projects

All the Updated information, fare, route maps, tender and construction updates of all high-speed rail (Bullet train) projects (HSR) in India

High Speed Rail Projects — Frequently Asked Questions

What is the status of the Mumbai–Ahmedabad bullet train?

The 508.17 km Mumbai–Ahmedabad High Speed Rail corridor is under construction by NHSRCL using Japanese Shinkansen technology, with the Gujarat section targeted to open first. It is India's first high-speed rail line.

Which other bullet train corridors are proposed in India?

Seven corridors have been studied under the National Rail Plan, including Delhi–Varanasi (865 km), Delhi–Ahmedabad (886 km), Mumbai–Nagpur (741 km), Mumbai–Hyderabad (767 km) and Chennai–Bengaluru–Mysuru (463 km).

What speed will Indian bullet trains run at?

The Mumbai–Ahmedabad corridor is designed for 320 km/h operations using Shinkansen technology, cutting the Mumbai–Ahmedabad journey to about two hours.

spot_img

RITES Bags Rs. 28 Crore Survey Contract From South Central Railway

RITES Limited has bagged a contract worth Rs. 27.96 crores from South Central Railways which includes conducting a Final Location Survey of high-speed elevated...

5th PSC Bridge Completed for Bullet Train Project

Surat (Metro Rail News): Mumbai -Ahmedabad Bullet Train Project (MAHSR) progressed as MG Contractors Pvt. Ltd. (MGCPL) completed the construction of the 260 m...

NHSRCL Initiates Electrification on Mumbai Ahmedabad Bullet Train Corridor 

(Metro Rail News): The electrification work for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) corridor has officially commenced. The first two steel masts have been erected...

Bullet Train Project: Full Span Girder Box Cast For Maharashtra Section 

(Metro Rail News): Mumbai-Ahmedabad Bullet Train Project (MAHSR) advanced as National High-Speed Rail Corporation Ltd (NHSRCL) cast the first full-span Pre-Stressed Concrete (PSC) Box...

Bullet Train Project: Bids Invited for Signaling Contract S1

(Metro Rail News): Mumbai–Ahmedabad High Speed Rail (MAHSR) project advanced as National High Speed Rail Corporation Ltd. (NHSRCL) invited bids for the S-1 Package...

4th PSC Bridge Completed for Mumbai-Ahmedabad Bullet Train Project

(Metro Rail News): Another major milestone has been achieved for the Mumbai -Ahmedabad Bullet Train Project (MAHSR) as MG Contractors Pvt. Ltd. (MGCPL) completed...
spot_img